7
Installation Instructions
To ensure fast and reliable results, avoid the
following when choosing locations for setting
up your terminal (TM01-X) and Ex-link box
(YCO09-Z):
– Unstable or uneven surfaces
– Drafts
– Excessive moisture or chemical vapors
– Excessive heat (e.g., from a heater or exposure
to direct sunlight). Do not install the equipment
in a control cabinet or other poorly ventilated
location. If you use multiple Ex-link boxes,
do not stack them.
– Excessive vibration
Note:
Observe the warnings and safety precautions
included in these instructions.
– Before putting the equipment into operation,
make sure the power cord is properly connected.
It is particularly important to make sure the pro-
tective grounding conductor is connected to the
housing of the Ex-link box. All equipment must
be connected to the equipotential bonding con-
ductor by connecting the grounding cable (not
included in delivery) to the grounding terminals
on each device.
The dimensions of the grounding cable are speci-
fied in national regulations for electrical installa-
tions. Installation must be performed by a trained
technician in accordance with national regula-
tions and acknowledged technological standards.
– Use only cabling and extensions approved by
Sartorius, as these are made in accordance with
the restrictions on permissible cable lengths
imposed by both the capacitance and inductivity
values (see the “Schedule to EC Type-Examina-
tion Certificate”) and the requirements for electro-
magnetic compatibility.
– Do not connect devices to the Ex-link box that
are capable of subjecting the Ex-link box to peak
voltages exceeding 375 V.
°C