
4. Fuel System
4-7
Float Level Inspection
Measures float fuel level to have the upper end of
float just contact with the float.
Float fuel level: 8.8 mm
Carefully bend the float arm for adjustment.
Check the float operation and the install it.
Carburetor Installation
Caution
Do not let foreign materials into the carburetor.
Install the carburetor and insulator onto intake
pipe with bolts.
Install fuel and vent pipes onto carburetor.
Install the carburetor upper part.
Tighten the connection hose.
Tighten the draining screw.
Connect the automatic by-starter connector.
Install air cleaner cap.
Conduct following operations
y
Adjustment of throttle valve cable.
y
Adjustment of oil pump.
y
Adjustment of idle speed.
Reed Valve
Removal
Remove the luggage box.
Remove the carburetor.
Remove carburetor insulator.
Remove inlet pipe.
Remove the reed valve.
Reed valve
Inlet pipe
Carburetor
upper part
Connection hose clamp
2 bolts
Fuel hose
Draining screw
Содержание JET 4R
Страница 1: ......
Страница 38: ...3 Lubrication System 3 6 ...
Страница 106: ...12 Brake System 12 2 Rear Drum Brake System 0 8 1 2kgf m 11 0 13 0kgf m 0 8 1 2kgf m ...
Страница 118: ...12 Brake System 12 14 Notes ...
Страница 134: ...14 Rear Wheel Rear Cushion 14 6 Note ...
Страница 163: ......