![SANUS VuePoint FLF322 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/sanus-vuepoint/flf322/flf322_instruction-manual_811108018.webp)
18
Manage Cables - Cable Tunnel
1
NOTES:
●
This product is
NOT
recommended for brick,
plaster, or wallpapered walls.
●
If wall has been painted, allow paint to cure at
least 30 days before installing cable tunnels.
●
Wipe away any dirt, dust, grease, etc. on the
surface and let dry completely before installing.
●
The tunnels
17
can be painted to match your wall.
●
The tunnels
17
can be cut to fit the length
required.
To Remove Adhesive Clips
1. Insert a flat object (e.g. - knife blade) behind the
clip and the adhesive pad and pry off the plastic clip.
2. Peel off the adhesive pad with your fingers.
3. If adhesive residue remains, use a cloth soaked in
an organic solvent to wipe away the residue.
NOTE:
First test the solvent in a concealed spot to
make sure it will not damage the wall surface.
15
15
16
Space clips
15
evenly along the length of the tunnel(s)
17
with a clip near each end. To combine tunnels, use the long
clip
16
to connect where they meet.
A
Press firmly until clips snap in place.
B
Peel off backing of adhesive pads on clips.
NOTE:
If using two tunnels, install five clips - four
15
clips and one long clip
16
.
If using only one tunnel, install three clips
15
.
TIP:
If the edges of the two tunnels do not align, reverse
one tunnel end for end.
A
B