![Santak CASTLE On-Line Series Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/santak/castle-on-line-series/castle-on-line-series_user-manual_810031014.webp)
- 7 -
1. Select power cable referring to power cable table.
2. Open UPS terminal cover.
3. Connect the protective earthing conductors to the rear panel left
earthing terminal.
4. Connect the protective bonding conductors to the rear panel right
earthing terminal.
5. Connect the output cable to the output terminal.
6. Connect the input cable to the input terminal, if EBM is required,
connect EBM cable to the EBM terminal.
DANGER: Inorder to reduce the risk of fire and hazards shock,
make sure all the connections are reliable and stightly
!
Содержание CASTLE On-Line Series
Страница 1: ...3C15KS 3C20KS...
Страница 2: ......
Страница 20: ...13 3C15KS 3C20KS...
Страница 37: ......