background image

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

SANTAK ELECTRONIC

SHENZHEN

CO.,LTD   

No.8 Baoshi Rd, Block 72 Baoan, Shenzhen,   
Guangdong, China

                                                                                             

www.eaton.com        www.santak.com 

 

614-02117XS1-02 

Содержание Castle C6K

Страница 1: ...6K S 10K S 3C10KS...

Страница 2: ......

Страница 3: ...ur electrical equipment This manual contains important instructions that you should follow during installation and maintenance of the UPS and batteries Please read all instructions before operating th...

Страница 4: ...on openings on the UPS s housing Ensure the air vents on the front side and rear of the UPS are not blocked Recommended at least 50cm of space on each side 6 Use dry cloth for cleaning 7 Use dry chemi...

Страница 5: ...Batteries have a high short circuited current and pose a risk of shock Take all precautionary measures specified below and any other measures necessary when working with batteries A remove all jewelle...

Страница 6: ...install store UPS in place where the relative humidity lower than 20 or higher than 90 C Do not install store UPS in place where there is flammable or corrosive gas place with large amounts of conduct...

Страница 7: ...7 2 3 UPS POWER CONNECTION 8 2 4 EBM CONNECTING AND INSTALLATION 11 2 5 UPS CONNECT TO COMPUTER PORT 12 2 6 UPS PARALLEL CARD OPTIONAL 13 2 7 EPO OPTIONAL 17 2 8 MAINTENANCE SWITCH OPTIONAL 18 2 9 US...

Страница 8: ...In the event of power failure the maintenance free batteries power the inverter In the event of inverter failure Overload UPS transfer to bypass mode after the failure overload remove UPS transfer to...

Страница 9: ...Symbol and Explanation Some or all of the following symbols may be used in this manual It is advisable to familiarize yourself with them and understand their meaning 1 2 Front view C6K C10K C6KS C10KS...

Страница 10: ...3 1 3 Rear View C6K C10K C6KS C10KS...

Страница 11: ...4 3C10KS RS232 Fan AC Input Breaker Terminal Cover Beam Frame Maintenance Bypass Switch Optional Intelligent Slot EPO Optional Parallel Card Optional...

Страница 12: ...ock range Power factor 0 9 Output Overload 105 125 load transfer to bypass mode after 10 min 0 30 or 1min 30 40 125 150 load transfer to bypass mode after 30s Over 150 load transfer to bypass after 0...

Страница 13: ...output line is not more than 10m the external communication line and the machine line and the temperature detection line is not more than 3m otherwise it may need to take installation restrictions or...

Страница 14: ...s a monitor or a laser printer to the UPS the start up power should be used for calculating the capacity of the UPS as its start up power consumption is too big when it is started 2 1 Inspection the p...

Страница 15: ...DANGER Inorder to avoid the Mains power switch current overload when UPS carries with rating load the Mains power switch rating current must be more than the bypass switch rating current bypass mode m...

Страница 16: ...inal 4 Connect the protective bonding conductors to the rear panel right earthing terminal 5 Connect the output cable to the output terminal 6 Connect the input cable to the input terminal if EBM is r...

Страница 17: ...nals C6K C10K C6KS C10KS Three Phase Terminals 3C10KS 7 Make the straps through across the Beam frame 8 Adjust the straps to proper position Fix the input cable output cable EBM cable tightly 9 Re scr...

Страница 18: ...DC voltage of battery pack is192Vdc with 16 pieces of 12V maintenance free batteries in series EBM consists multi battery packs Inorder to avoid hazards shock make sure Battery battery string connect...

Страница 19: ...ock do not connect EBM to UPS Before finish EBM connecting 3 Connect EBM to UPS after finish connecting between EBM and UPS UPS output does not carry with any load then turn on EBM switch to On possit...

Страница 20: ...is equipped with parallel cables up to 3 UPSs can be connected in parallel to realize output power sharing and power redundancy 2 Parallel installation and operation Parallel UPS is an optional functi...

Страница 21: ...of the UPSs is required to be less than 20 The distance between the UPSs in parallel is more than 20 meters The difference between the wires of input and output of the UPSs is required to be less tha...

Страница 22: ...15 C6K C10K C6KS C10KS...

Страница 23: ...16 3C10KS...

Страница 24: ...o Online mode Turn on UPS without main power Short press each UPS button to make each UPS power on then long press one UPS button and all the paralleled UPS will go to Battery mode Note Long press mea...

Страница 25: ...provide power to your equipment in bypass mode and the safety of service person during maintenance The more detail and further information for maintenance switch installation can refer to the maintena...

Страница 26: ...n will provide installation Before installation UPS must be turned off AS400 card It owns isolated dry contact relay outputs for UPS status such as Mains Utility failure Battery low UPS alarm OK or on...

Страница 27: ...offer conectivity card box and monitor installation and further information please refer the card user manual If require WinPower sofare and AS400 NMC CMC USB RS232 Any detail and further information...

Страница 28: ...Product click System Monitoring 2 Choose the operation system you need and follow the instruction described on the website to download the software When your computer restarts the WinPower software wi...

Страница 29: ...uously for 2 to 10 seconds when UPS in Online mode Quick press the button to switch display meters 3 LED Indicator There are 4 LED Normal indicator battery indicator bypass indicator and fault indicat...

Страница 30: ...specification Grid Quantity from left to right Actual Load Level 1 0 15 Level 2 16 35 Level 3 36 55 Level 4 56 75 Level 5 76 95 Level 6 96 SHORT icon will be displayed as bellow when UPS output is sh...

Страница 31: ...attery Voltage Capacity Cells number Input Voltage 3 Phase Frequency Bypass Voltage Frequency 3 Battery information display battery capacity level in present Grid Quantity from left to right Capacity...

Страница 32: ...with below icon light up Lightened circularly alarm information Lightened constantly critical fault 6 UPS working mode display Icon Information description UPS is working in online mode UPS is chargi...

Страница 33: ...d close battery switch then turn bypass protect switch to ON side If the battery cell numbers displayed in the LCD is different from actual please call the SANTAK service hotline or contract the distr...

Страница 34: ...tem self test will be carried out when UPS turn on UPS turn to Online mode after self test Indicator and LCD display as following Online LED lighted no fault displayed Online mode Indicator descriptio...

Страница 35: ...turn to battery mode after self test Both Online LED and battery LED lighted Load powered by battery Buzzer beep once every 4 seconds to indicate user than UPS is working on battery mode Buzzer can b...

Страница 36: ...ndicator and LCD display as following Online LED lighted no fault displayed Bypass LED light and buzzer beep once every 2 seconds to indicate that UPS work on bypass mode Buzzer can be mute when funct...

Страница 37: ...ld be made Battery replacement should be performed by qualified person Replace batteries with the same quantity and same type of batteries Do not replace the battery individually All the batteries sho...

Страница 38: ...voltage Connect UPS to battery and turn on battery switch If battery low voltage charge battery via external charger UPS No output Light constantly 22 Overload Check the loads and remove some non cri...

Страница 39: ...light circularly 0b Battery voltage is low When audible alarm sounding every second battery is almost empty Emergency supply period shorter than nominal value Batteries not fully charged Charge the ba...

Страница 40: ......

Страница 41: ...SANTAK ELECTRONIC SHENZHEN CO LTD No 8 Baoshi Rd Block 72 Baoan Shenzhen Guangdong China www eaton com www santak com 614 02117XS1 02...

Отзывы: