4.6 - COMMISSIONING
4.6.a - First start-up (Fig. 8 - 9)
•
Open the water supply tap upstream of the machine.
•
Power on the machine power supply bringing the
breaker upstream of the machine to ON.
•
Press the “ON/OFF” button (1) which turns on to
indicate that the machine is live; the unit displays
(2) turn on.
•
The boiler is automatically filled with water; the grad
-
ed scale “A” on the level display (3) turns on; when
the full level is reached, scale “A” is complete and
the display turns on fully.
•
When the “MAX” level is reached, the graded scale
“A” stays o steady and the display is fully lit.
IMPORTANT
If automatic filling does not take place
within 120 seconds, the machine stops
and the LEDs on the unit button panels
light up and flash.
Check that the water supply tap is open.
•
When filling is completed, dispense water from the
units by operating on levers (4), without fitting the
filter holders.
•
Check that water comes out properly, venting any
air bubble present in the circuit.
IMPORTANT
Remove the cup heating plate (5) and
press button (6) for 3 or 4 seconds to fully
vent any air bubble in the circuit.
•
Turn the steam dispensing levers (7) to open position
until steam is dispensed from the taps (8), then bring
the levers (7) back to the middle position.
•
Dispense water by pressing button (9) located above
the unit to vent any air bubble in the circuit.
•
Wait for the set temperature to be reached for steam
(“124°C”) and coffee water (“94°C”), which are shown
on display (3) and (2) of each dispensing unit, re-
spectively.
2 Units
3 Units
Содержание Opera
Страница 4: ...06 2017 OPERA 0 2 3 CAP 0 Index THE REVOLUTION 2016 ...
Страница 6: ...06 2017 OPERA CAP 0 2 2 Index EN THE REVOLUTION 2016 ...
Страница 16: ...06 2017 06 2017 6 6 OPERA CAP 2 Technical Data Transportation Unpacking EN THE REVOLUTION 2016 ...
Страница 20: ...06 2017 4 4 OPERA CAP 3 Safety devices EN THE REVOLUTION 2016 ...
Страница 32: ...06 2017 12 12 OPERA CAP 4 Installation and connection EN THE REVOLUTION 2016 ...
Страница 62: ...06 2017 6 6 OPERA CAP 6 Cleaning and maintenance EN THE REVOLUTION 2016 ...
Страница 66: ...06 2017 4 4 OPERA CAP 7 Decommissioning EN THE REVOLUTION 2016 ...
Страница 67: ......