![Sanken SWL Series Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/sanken/swl-series/swl-series_operation-manual_3985479023.webp)
■ Installation location
SWL100-**-S / SWL150-**-S / SWL240-**-S
A
B
C
SWL300-**-S
A
B
7. Mounting Method
C
Please contact us about the option installation method.
Because this product uses surface-mounting parts, please be aware of the installation method in
which contact and stress are applied to the board at the time of installation.
Use a small washer W sem screw M3 as the mounting screw.
Hatching indicates the allowable range for the metal part of the installation on the front side of the chip.
The size of the hatched area is the distance required for the purpose of the decoupling.
Use the solders of A, B, and C in the figure with the customer's equipment frame(FG).
SWL100 : A and C are grounded.
SWL300 : A, B, C are grounded.
SWL150 , SWL240 : A and B are grounded.
PAN40012-001E-07
SANKEN ELECTRIC CO.,LTD.
23/26