14
INSTALLATION
Transportation
Transportation of the dryer can be carried
out as shown in the illustration below.
Figure 1
For transportation, use a trolley positioned
only on the right or left side of the wall.
Attention!
Incorrect handling of the dryer can
cause damage to things and people.
Pay attention during the handling
phase and in case of overturning wait
an hour before switching on to avoid
damage to the heat pump.
Positioning
Before installing the appliance, careful-
ly read the instructions in the
Safety and
Warnings
chapter
For maximum performance, it is advisable
to position the dryer in a perfect level with
levelling instrument and compensate for
any irregularities on floor surface with the
adjustable feet.
Figure 2
Attention!
Before normal use of the appliance,
clean the drum with a damp cloth in
order to eliminate any traces of lubri-
cants used in the production process.
Aeration
The drying process causes the dryer to
heat up with simultaneous heating of the
external environment. For this reason it is
advisable to always ventilate the room.
ATTENTION!
Do not cover the openings for the
cooling air in front when the dryer is
running.
Do not cover or reduce the space be-
tween the floor and the base of the
dryer (pedestals, strips, rugs).
Place the appliance in vertical posi-
tion and wait 12 hours before starting.
Содержание SDR8
Страница 2: ......