background image

 

Installation guide for Sandtoft TLE Dry Verge 

 
3)  Locate  the  first  verge  unit  over 
the  eaves  closure  and  click  into 
position. 

Screw 

through 

an 

appropriate  fixing  hole  into  the 
centre of the vertical batten using a 
35  x  4mm  stainless  steel  screw 
(supplied).  
 
 
 
 
 
 
 
 
 
4) Fit the next verge unit by locating 
over the verge tile and clicking the 
tail over the head of the first verge 
unit. Screw through an appropriate 
fixing  hole  into  the  centre  of  the 
batten.  Follow  this  procedure  for 
each tile course up to the ridge. Nail 
all  verge  tiles.  At  the  right  hand 
verge,  tiles  can  also  be  secured 
using tile clips if required. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Отзывы: