Installation & Operation Manual Merlin
IOM
Rev: 05 01-20
4
Typical Installation Arrangement
Terminal Connections
1.
POWER / LINE IN
100-240V AC Power should be supplied to the [POWER / LINE IN] terminal and fused at 3A.
On connecting the mains supply to the panel the power LED indicator will light up – this is
located on the front cover (S&S Northern Logo).
2.
GAS SOLENOID VALVE OUTPUT
100-240V AC electrical power supplied from the [VALVE OUT] connector using a 3 core cable
can be connected to a gas solenoid valve which can shut the gas supply on alarm status.
Pressure sensors should be screwed to the downstream port of the valve.
Refer to your valve manual for more information and wiring!