3  

General information  

The Merlin  is an Electric and Water utilities isolation panel with gas proving and 
ventilation interlocking. 

  

The system comprises of a control panel and a gas pressure sensor. The Merlin     

  can receive connections from remote air pressure differential switches or external current    
  monitors, remote emergency shut-off buttons, gas detectors and a CO2 monitor. It can also    
  be integrated with a BMS and fire alarm.  

 

                It is recommended that the user reads this guide before using the system. Please do NOT  

               attempt to operate the unit until the contents of this document have been read and are     
               thoroughly understood.    

 

 Installation 

2.1 

Panel Mounting. 

The control panel is designed for surface mounting using 4 mounting screws.                                  

Removing the cover on the panel gives access to the circuit board. The PCB should be 
removed before drilling entry holes into the case. 

2.2 

Mains Supply. 

A 230-volt electrical supply should be supplied to the panel. This should be 

externally fused at 3 Amps using a fused spur and should be connected to the terminals 
marked ”LNE Power IN”

 

2.3 

Gas solenoid valve. 

The gas solenoid valve should be powered using the terminals on the 

Merlin  

marked “LNE to VALVE” and will be internally fused at 3 Amps. 

2.4 

  Electric Contactor. 

An electrical output will be supplied to an electrical contactor (supplied by     

             others). This will be internally fused at 3 Amps and should be connected to the terminals  
             

marked “LNE Electric Contactor”. 

2.5 

  

Water Valve. 

The water solenoid valve should be powered using the terminals on the Merlin 

 

  1000V

W+ marked “LNE WATER VALVE” and will be internally fused at 3 Amps.

 

2.6 

BMS Connections. 

Terminal connections are available on the circuit board for connections to 

Building Management systems etc. Detai

led on the circuit board as “BMS N/C, Com and N/O” 

these are volt free connections.

 

2.7 

Gas Pressure Transmitter. 

The terminals marked pressure sensor “+ - in “.These wire to the 

gas pressure transmitter which is screwed into the downstream port on the gas solenoid valve. 
Red + positive, Black 

– negative and Blue IN. Please ensure this is wired as instructed.                                                                                                                   

Minimum Operating Pressure = 12Mbar                                                                              
Maximum Operating Pressure = 100Mbar. 

2.8 

  Timeout Facility.

 

The Merlin  has a built-in Auto-shut down feature and it will turn   

             itself off after predefined time. Auto-shut down timeout is selectable.

 

There are two blue dip-switches located on the inside facia of the Merlin  
labelled “Time1” and “Time2”. They are factory set in the ‘off’ position. On installation, they can 

be switched to the 

‘on’ position to select required timeout. 

Time1 Off, Time2 Off 

– 2 hours 

Time1 On, Time2 Off 

– 4 hours 

Time1 Off, Time2 On 

– 8 hours 

Time1 On, Time2 On 

– no timeout (auto-shut down disabled) 

               
 

 

Содержание Merlin 1000VW+

Страница 1: ...Merlin 1000VW Product Data Sheet S S Northern Ltd 1 Gas Safety Products Merlin 1000VW Gas Proving Electric Water Isolation System Installation operating and maintenance 20 01 2017...

Страница 2: ...as Detected 4 2 11 FS 123 4 2 12 Fan PD Switch 4 2 13 12v DC 4 2 14 Internal Buzzer 4 3 Operation Instructions 4 3 1 How to turn the system on and off 4 3 2 Explanation of LED status 4 Power LED 4 Gas...

Страница 3: ...ally fused at 3 Amps 2 4 Electric Contactor An electrical output will be supplied to an electrical contactor supplied by others This will be internally fused at 3 Amps and should be connected to the t...

Страница 4: ...the fans when the control panel is switched on 2 12 Fan PD Switch This terminal is used to receive an input signal from external air pressure switches or external current monitors This terminal is li...

Страница 5: ...panel is checking the integrity of the gas installation upon start up GREEN proving the gas line do NOT operate any appliances Test Fail LED Under normal working conditions this LED is off When the p...

Страница 6: ...MS integration The Merlin 1000VW can be integrated with a BMS to make or break a circuit on gas on gas off valve open or valve closed This will tell the BMS whether or not the room has use of the gas...

Страница 7: ...acia of the Merlin 1000VW labelled Fill Time and Prove Time They are factory set in the off position Fill and prove time can be changed by turning the relevant dip switch to on position Fill time Off...

Страница 8: ...ns and Fire Alarm input wired in series purchased separately VOLT FREE INPUT 10 Methane CO or LPG Detector power supply and volt free input purchased separately CO2 Monitor purchased separately VOLT F...

Страница 9: ...ww snsnorthern com info snsnorthern com South East Division Tel 44 0 1702 291 725 Fax 44 0 1702 299 148 south snsnorthern com Rev Date Author Description 01 20 01 2017 S S Northern BT Merlin 1000VW Pr...

Отзывы: