background image

u1fmdl1sm-rev0814  

Model U1F UL79 Listed Metallic Design Level 1   Page 6

PRINCIPLE OF PUMP OPERATION

This  ball  type  check  valve  pump 

is powered by compressed air and is 

a  1:1  ratio  design. The  inner  side  of 

one diaphragm chamber is alternately 

pressurized  while  simultaneously 

exhausting  the  other  inner  chamber. 

This causes the diaphragms, which are 

connected by a common rod secured by 

plates to the centers of the diaphragms, 

to move in a reciprocating action. (As 

one diaphragm performs the discharge 

stroke  the  other  diaphragm  is  pulled 

to  perform  the  suction  stroke  in  the 

opposite  chamber.) Air  pressure  is 

applied over the entire inner surface of 

the diaphragm while liquid is discharged 

from the opposite side of the diaphragm. 

The diaphragm operates in a balanced 

condition  during  the  discharge  stroke 

which allows the pump to be operated 

at discharge heads over 200 feet (61 

meters) of water.

For maximum diaphragm life, keep 

the pump as close to the liquid being 

pumped as possible. Positive suction 

head  in  excess  of  10  feet  of  liquid 

(3.048  meters)  may  require  a  back 

pressure regulating device to maximize 

diaphragm life.

Alternate  pressurizing  and 

exhausting of the diaphragm chamber 

is performed by an externally mounted, 

pilot  operated,  four  way  spool  type 

air distribution valve. When the spool 

shifts to one end of the valve body, inlet 

pressure is applied to one diaphragm 

chamber  and  the  other  diaphragm 

chamber  exhausts.  When  the  spool 

shifts to the opposite end of the valve 

body, the pressure to the chambers is 

reversed. The air distribution valve spool 

is moved by a internal pilot valve which 

alternately pressurizes one end of the air 

distribution valve spool while exhausting 

the other end. The pilot valve is shifted 

at  each  end  of  the  diaphragm  stroke 

when  a  actuator  plunger  is  contacted 

by the diaphragm plate. This actuator 

plunger then pushes the end of the pilot 

valve spool into position to activate the 

air distribution valve.

The  chambers  are  connected  with 

manifolds with a suction and discharge 

check  valve  for  each  chamber, 

maintaining flow in one direction through 

the pump.

INSTALLATION AND START-UP

Locate  the  pump  as  close  to  the 

product being pumped as possible. Keep 

the suction line length and number of 

fittings to a minimum. Do not reduce the 

suction line diameter.

For installations of rigid piping, short 

sections  of  flexible  conductive  hose 

should be installed between the pump 

and the piping. The flexible conductive 

hose reduces vibration and strain to the 

pumping  system.  A  surge  suppressor 

is  recommended  to  further  reduce 

pulsation in flow.

AIR SUPPLY

Air supply pressure cannot exceed 

100 psi (7 bar). Connect the pump air 

inlet to an air supply of sufficient capacity 

and  pressure  required  for  desired 

performance. When the air supply line 

is  solid  piping,  use  a  short  length  of 

flexible conductive hose not less than 

1/2"  (13mm)  in  diameter  between 

the  pump  and  the  piping  to  reduce 

strain to the piping. The weight of the 

air  supply  line,  regulators  and  filters 

must  be  supported  by  some  means 

other than the air inlet cap. Failure to 

provide support for the piping may result 

in  damage  to  the  pump. A  pressure 

regulating  valve  should  be  installed 

to insure air supply pressure does not 

exceed recommended limits.

AIR VALVE LUBRICATION

The  air  distribution  valve  and  the 

pilot  valve  are  designed  to  operate 

WITHOUT  lubrication.  This  is  the 

preferred mode of operation. There may 

be  instances  of  personal  preference 

or  poor  quality  air  supplies  when 

lubrication  of  the  compressed  air 

supply is required. The pump air system 

will  operate  with  properly  lubricated 

compressed  air  supply.  Proper 

lubrication requires the use of an air line 

lubricator (available from Warren Rupp) 

set to deliver one drop of SAE 10 non-

detergent oil for every 20 SCFM (9.4 

liters/sec.) of air the pump consumes 

at the point of operation.  Consult  the 

pump’s published Performance Curve 

to determine this.

AIR LINE MOISTURE

Water in the compressed air supply 

can create problems such as icing or 

freezing  of  the  exhaust  air,  causing 

the  pump  to  cycle  erratically  or  stop 

operating. Water in the air supply can 

be  reduced  by  using  a  point-of-use 

air dryer to supplement the user’s air 

drying equipment. This device removes 

water from the compressed air supply 

and  alleviates  the  icing  or  freezing 

problems.

AIR INLET AND PRIMING

To  start  the  pump,  open  the  air 

valve approximately 1/2" to 3/4" turn. 

After  the  pump  primes,  the  air  valve 

can be opened to increase air flow as 

desired. If opening the valve increases 

cycling rate, but does not increase the 

rate  of  flow,  cavitation  has  occurred. 

The valve should be closed slightly to 

obtain the most efficient air flow to pump 

 

flow ratio.

BETWEEN USES

When the pump is used for materials 

that tend to settle out or solidify when 

not  in  motion,  the  pump  should  be 

flushed  after  each  use  to  prevent 

damage.  (Product  remaining  in  the 

pump  between  uses  could  dry out  or 

settle out. This could cause problems 

with the diaphragms and check valves 

at  restart.)  In  freezing  temperatures 

the pump must be completely drained 

between uses in all cases.

Содержание U1F series

Страница 1: ...ce and Conversion Kits 12 Composite Repair Parts List 13 Air Distribution Valve Assembly Drawing and Parts List 14 Air Distribution Valve Servicing 15 Pilot Valve Servicing Assembly Drawing Parts List 16 Diaphragm Service Drawing with Overlay 17 Diaphragm Service Drawing Non Overlay 17 Diaphragm Servicing 18 Overlay Diaphragm Servicing 18 Actuator Plunger Servicing 19 Check Valve Servicing 20 Chec...

Страница 2: ......

Страница 3: ...nd other strong oxidizing agents UHMW PE A thermoplastic polymer that is highly resistant to a broad range of chemicals Exhibits outstanding abrasion and impact resistance along with environmental stress cracking resistance Materials Maximum Minimum Operating Temperatures For specific applications always consult Warren Rupp s Chemical Resistance Chart SANDPIPER pumps are designed to be powered onl...

Страница 4: ...X G T X S S 6 00 53 24 Explanation of Pump Nomenclature Porting Options N NPT Threads B BSPT Tapered Threads S NPT Suction Port Facing Air Inlet NPT Discharge Port Facing Air Exhaust Pump Style S Standard Pump Options 6 Metal Muffler Check Valve Seat A Aluminum T PTFE Non Wetted Material Options X Unpainted Aluminum C Conductive Painted Aluminum Model U1FB1XBTXNS600 is UL79 listed for pumping Gaso...

Страница 5: ... 08 Bar 40 PSI 2 72 Bar 80 PSI 5 44 Bar 10 17 30 51 35 59 5 40 68 CAPACITY Liters per minute HEAD U S Gallons per minute NPSHR METERS FEET 20 PSI 1 36 Bar Air Inlet Pressure MODEL U1F Metallic Performance Curve Performance based on the following elastomer fitted pump flooded suction water at ambient conditions The use of other materials and varying hydraulic conditions may result in deviations in ...

Страница 6: ...T 1 2 NPT WITH 530 033 000 MUFFLER BOTH SUCTION AND DISCHARGE PORTS ARE AVAILABLE WITH 1 BSPT TAPERED THREADS BOTTOM VIEW FRONT VIEW SIDE VIEW 1 NPT EXHAUST PORT FOR OPTIONAL MUFFLER STYLES OR PIPING EXHAUST AIR IN SUBMERGED APPLICATIONS Dimensions U1F UL79 LISTED Metallic Dimensions in Inches Dimensional Tolerance 1 8 ...

Страница 7: ...ORT 1 NPT SUCTION PORT 1 NPT AIR INLET 1 2 NPT WITH 530 033 000 MUFFLER BOTH SUCTION AND DISCHARGE PORTS ARE AVAILABLE WITH 1 BSPT TAPERED THREADS BOTTOM VIEW FRONT VIEW SIDE VIEW 1 NPT EXHAUST PORT FOR OPTIONAL MUFFLER STYLES OR PIPING EXHAUST AIR IN SUBMERGED APPLICATIONS Dimensions in Millimeters Dimensional Tolerance 3mm ...

Страница 8: ...ble conductive hose reduces vibration and strain to the pumping system A surge suppressor is recommended to further reduce pulsation in flow AIR SUPPLY Air supply pressure cannot exceed 100 psi 7 bar Connect the pump air inlet to an air supply of sufficient capacity and pressure required for desired performance When the air supply line is solid piping use a short length of flexible conductive hose...

Страница 9: ...Filter Regulator Air Dryer 2 CAUTION Use a gasoline resistant pipe compound to make pipe joints tight Pump shall be installed in accordance to Flammable and Combustible Liquids Code NFPA 30 or the Automotive and Marine Service Station Code NFPA 30A as appropriate to the intended use of the pump The pump must be rigidly mounted with fasteners to a conductive base or natural ground To maintain condu...

Страница 10: ...ffler Corrective Action Remove muffler screen clean or de ice and reinstall Refer to the Air Exhaust section of your pump SERVICE MANUAL What to Check Pumped fluid in air exhaust muffler Corrective Action Disassemble pump chambers Inspect for diaphragm rupture or loose diaphragm plate assembly Refer to the Diaphragm Replacement section of your pump SERVICE MANUAL What to Check Suction side air lea...

Страница 11: ... installation and start up of the pump It is the responsibility of the purchaser to retain this manual for reference Failure to comply with the recommendations stated in this manual will damage the pump and void factory warranty WARNING Airborne particles and loud noise hazards Wear ear and eye protection B e f o r e d o i n g a n y maintenance on the pump be certain all pressure is completely ven...

Страница 12: ...rethane Rubber 360 Nitrile Rubber Color coded RED 361 Nitrile 363 FKM Fluorocarbon Color coded YELLOW 364 E P D M Rubber Color coded BLUE 365 Neoprene Rubber Color coded GREEN 366 Food Grade Nitrile 368 Food Grade EPDM 370 Butyl Rubber Color coded BROWN 371 Philthane Tuftane 374 Carboxylated Nitrile 375 Fluorinated Nitrile 378 High Density Polypropylene 379 Conductive Nitrile 405 Cellulose Fibre 4...

Страница 13: ...u1fmdl1sm rev0814 Model U1F UL79 Listed Metallic Design Level 1 Page 11 ...

Страница 14: ...ining Rings Air Valve Assembly and Pilot Valve Assembly 476 213 760 Wetted End Kit Nitrile Diaphragms Nitrile Check Balls and PTFE Check Valve Seats 476 213 635 Wetted End Kit Neoprene Backup Diaphragms PTFE Overlay Diaphragms PTFE Check Balls and PTFE Check Valve Seat 476 213 671 Wetted End Kit Neoprene Backup Diaphragms PTFE Overlay Diaphragms PTFE Check Balls and PTFE Encapsulated FKM O rings ...

Страница 15: ...Diaphragm 2 286 008 365 Diaphragm 2 15 286 015 604 Diaphragm Overlay 2 16 360 093 360 Gasket Air Valve 1 ITEM PART NUMBER DESCRIPTION QTY 17 360 103 360 Gasket Pilot Valve 1 18 360 104 379 Gasket Air Inlet 1 19 518 175 156 Manifold Suction 1 518 175 156E Manifold Suction 1 BSP Tapered 1 20 518 176 156 Manifold Discharge 1 518 176 156E Manifold Discharge 1 BSP Tapered 1 21 560 001 379 O Ring 2 22 5...

Страница 16: ... 1 B 1 B 1 C 1 D 1 D 1 E 1 E 1 F 1 F 1 D 1 C AIR VALVE ASSEMBLY PARTS LIST ITEM PART NUMBER DESCRIPTION QTY 1 031 183 000 Gas Valve Assembly 1 1 A 095 109 157 Valve Body 1 1 B 031 139 000 Sleeve and Spool Set 1 1 C 132 029 357 Bumper 2 1 D 560 020 360 O Ring 10 1 E 165 127 157 Cap End 2 1 F 170 032 330 Capscrew 8 ...

Страница 17: ...rcontaminants Remove the sleeve if needed and replace with a new sleeve and spool set item 1 A STEP 3 Reassembly of the air valve Install one bumper item 1 C and one end cap item 1 E with two o rings item 1 D and fasten with four hex capscrews items 1 F to the valve body items 1 A Remove the new sleeve an spool set item 1 A from the plastic bag Carefully remove the spool from the sleeve Install th...

Страница 18: ... of the pilot valve Generously lubricate outside diameter of the sleeve and o rings Then carefully insert sleeve into valve body Take CAUTION when inserting sleeve not to shear any o rings Install retaining ring to sleeve Generously lubricate outside diameter of spool and o rings Then carefully insert spool into sleeve Take CAUTION when inserting spool not to shear any o rings Use BP LS EP 2 multi...

Страница 19: ...u1fmdl1sm rev0814 Model U1F UL79 Listed Metallic Design Level 1 Page 17 Diaphragm Service Drawing Non Overlay Diaphragm Service Drawing with Overlay 5 28 6 23 14 15 24 11 13 5 28 6 23 14 24 13 11 ...

Страница 20: ...mbly onto the diaphragm rod leaving loose Step 5 Installing the diaphragm and rod assembly to the pump Make sure the bumper item 6 is installed over the diaphragm rod Insert rod into pump On the opposite side of the pump pull the diaphragm rod out as far as possible Make sure the second bumper is installed over the diaphragm rod Push the threaded stud of the other outer diaphragm plate assembly th...

Страница 21: ... the o rings if necessary Apply a light coating of grease to each o ring and re install the plungers in to the bushings Push the plungers in as far as they will go To remove the bushings item 7 first remove the retaining rings item 26 by using a flat screwdriver NOTE It is recommended that new retaining rings be installed Step 3 Re install the pilot valve assemblyintotheintermediateassembly Be car...

Страница 22: ...removed the check valve components can be seen Inspect the check balls items 2 for wear abrasion or cuts on the spherical surface The check valve seats item 30 should be inspected for cuts abrasive wear or embedded material on the surfaces of both the external and internal chambers The spherical surface of the check balls must seat flush to the surface of the check valve seats for the pump to oper...

Страница 23: ... reduce pump performance When the pumped product source is at a higher level than the pump flooded suction condition pipe the exhaust higher than the product source to prevent siphoning spills See illustration 3 at right CONVERTING THE PUMP FOR PIPING THE EXHAUST AIR The following steps are necessary to convert the pump to pipe the exhaust air away from the pump Remove the muffler item 21 The air ...

Страница 24: ...e for detailed grounding instruction and the type of equipment required or in the absence of local codes an industry or nationally recognized code having jurisdiction over specific installations and installation codes Take action to prevent static sparking Fire or explosion can result especially when handling flammable liquids The pump piping valves con tainers or other miscellaneous equipment mus...

Страница 25: ...A Certifies that Air Operated Double Diaphragm Pump Series HDB HDF M Non Metallic S Non Metallic M Metallic S Metallic T Series G Series U Series EH and SH High Pressure RS Series W Series SMA and SPA Submersibles and Tranquilizer Surge Suppressors comply with the European Community Directive 2006 42 EC on Machinery according to Annex VIII This product has used Harmonized Standard EN809 1998 A1 20...

Страница 26: ...Y 2014 EN 60079 25 20011 For pumps equipped with Pulse Output ATEX Option KEMA Quality B V 0344 AODD Pumps and Surge Suppressors For Type Examination Designations AODD Air Operated Double Diaphragm Pumps EC Type Examination Certificate No Pumps KEMA 09ATEX0071 X DEKRA Certification B V 0344 Meander 1051 6825 MJ Arnhem The Netherlands Manufacturer Warren Rupp Inc A Unit of IDEX Corportion 800 North...

Страница 27: ...X CE 0344 Pump types HDB1 HDB40 HDB2 HDB50 HDB3 HDF1 HDF25 HDF2 HDF3M PB S05 S1F S15 S20 S30 SB1 SB25 ST1 ST40 G15 G20 and G30 without the above listed options no aluminum parts II 1 G c T5 II 3 1 G c T5 II 1 D c T100o C I M1 c I M2 c KEMA 09ATEX0071 X KEMA 09ATEX0071 X KEMA 09ATEX0071 X KEMA 09ATEX0071 X KEMA 09ATEX0072 X No Yes Yes No Yes KEMA 09ATEX0071 X KEMA 09ATEX0072 X CE 0344 Pump types DM...

Отзывы: