Communications Signal  

Reference Requirements

All communications systems that interface with the PureWave 
SMS-250 equipment must be designed for operation in a 
multipoint earth (ground) reference system.

See examples of ground plan diagrams in Figures 7 and 8.

Control and Grounding Connections

For control and grounding connections:

STEP 8. 

Install control and communication cabling using 
the entry location in the cable termination area.

STEP 9. 

Attach the ground bus of the PCS to the system 
ground in accordance with the installation drawing.

STEP 10. 

Seal the conduits with duct-sealing compound to 
prevent water from entering the system through the 
conduits.

Connection Checks

Check all field-installed cables and wiring to the power 
conversion system by performing a “point-to-point” check 
on all of the wiring to verify the system is wired, labeled, 
and terminated per drawing PEA-1610-4-IN and any project-
specific drawings supplied with the PureWave SMS-250 
system. Note any problems found and corrective actions 
applied.

Torques

Check all factory and field-bolted electrical connections 
inside the PCS enclosure and verify they are torqued to the 
proper tightness. See Table 4 for torque requirements.

Base Covers

Install the base covers (if not already installed) at the front 
and back forklift entries of the enclosure. They are typically 
stored on the inside of the enclosure door. See Figure 9.

Table 4. Torque Requirements

Assembly

Part

Hardware

Tool

Torque 

(N-M)

Torque 

(FT-LBS)

Dead-front 

access 

panels

Panels

M8 

serrated 

flange

13 mm 

Socket

13 .6

10 .0

EMI fastners

M5x12 

screw

#2 

Phillips

3 .9

2 .9

Bus 

connections

N/A

M10 

flange 

nut/bolt

15 mm 

Socket

54 .2

40 .0

Islanding 

tray

Tray

M8 

serrated 

flange

13 mm 

Socket

13 .6

10 .0

CT terminal 

block

#10-32 

Terminals

Slot 

Driver

2 .0

1 .5

Terminal 

blocks

M4 

terminals

Slot 

Driver

1 .7

1 .25

Programmable 

logic 

controller

M3 

mounting

#1 

Phillips

1 .1

0 .8

Figure 9. Location of base covers.

Base covers

Base cover  
storage location

Installation, Assembly, and Setup

Содержание PureWave SMS-250

Страница 1: ...placement Instructions and Labels 3 Location of Safety Labels 4 Trip Settings 5 Breaker Protection Curves 6 Safety Precautions 7 Shipping and Handling Packing 8 Inspection 9 Handling 9 Installation Assembly and Setup System Design 11 Concrete Pad Specifications 11 Pad Requirements 11 Shimming Grouting and Caulking the PCS Enclosure 12 Mounting 12 Cable Terminations 13 Battery Connection 13 Power C...

Страница 2: ... inside a compartment in the PCS enclosure where they can be easily retrieved for future use Proper Application WARNING The equipment in this publication must be selected for a specific application The application must be within the ratings furnished for the equipment Failure to do so can result in damage to equipment Warranty The warranty and or obligations described in S C s standard conditions ...

Страница 3: ...injury if instructions including recommended precautions are not followed NOTICE NOTICE identifies important procedures or requirements that can result in product or property damage if instructions are not followed Following Safety Instructions If you do not understand any portion of this instruction sheet and need assistance contact your nearest S C Sales Office or S C Authorized Distributor Thei...

Страница 4: ...ngs The symbol represents the power on button When the button with the symbol is pressed the breaker places the equipment into a fully powered state Equipment grounding conductor The symbol represents the power off button When the button with the symbol is pressed the breaker dis connects the load side from the power source The ac breaker disconnects the ac output to theload A dc breaker to discon...

Страница 5: ...A rms 16 68 ms Short circuit current maximum amps peak and duration ms 2280 A rms 16 68 ms Short circuit current breaking amps RMS and duration ms 0 Arms Short L1 L3 Short circuit current initial amps rms and duration of 16 7 ms or 1 cycle 1110 3 A rms 13 ms Short circuit current maximum amps peak and duration ms 1570 A peak 13 ms Short circuit current breaking amps RMS and duration ms 0 A rms Sho...

Страница 6: ...ruction Sheet 659 555 Safety Information Breaker Protection Curves The power conversion system has a fixed output The ac breaker is configured at the factory with the following protection curve Current in Amperes ...

Страница 7: ...heuseofthepadlockprovide protection against inadvertent contact with hazardous voltages 8 GROUNDING For grounding purposes the pro ceeding must be followed The PCS base ground bar in the cable termination area must be connected to a suitable earth ground for testing before energizing the unit and at all times when energized The overall ground system should be sufficient to limit the ground potenti...

Страница 8: ...sion system enclosure ships in one piece See Figures 1 and 2 NOTICE The Human Machine Interface HMI computer and bat teries for the PureWave SMS 250 system are shipped separately Figure 1 The power conversion system enclosure Figure 2 Internal view of the power conversion system ...

Страница 9: ...rawing PEA 1610 4 IN and any other project specific lifting drawings supplied with the PureWave SMS 250 system Lifting equipment such as spreader bars and hoist sling straps are provided by others To avoid damaging the PCS enclosure when placing it at the desired location observe normal recommended procedures as well as the following general instructions CAUTION The PCS installer must ensure ALL l...

Страница 10: ...or the location of cable entry conduit and mounting bracket installation areas For further details refer to drawing PEA 1610 4 IN and the other project specific lifting drawings supplied with the PureWave SMS 250 system STEP 5 Remove the sling straps Figure 3 Proper lifting of the power conversion system enclosure Figure 4 Conduit and bracket measurements for pad mounting This point should be at l...

Страница 11: ...f degree and should have a flatness within inch 3 175 mm The pad should extend beyond the edge of the enclosure by an adequate amount to prevent the pad from cracking or breaking when the Hilti Kwik Bolt TZ anchor bolts are installed to bolt the PCS enclosure to the pad Pad Requirements General Requirements The concrete pad contractor shall provide and be responsible fordeterminationandexecutionof...

Страница 12: ...nt 300 ml Gray around the outer edge of the bottom flange where it meets the concrete pad to provide a seal around the base of the PCS The purpose of the caulk is to further prevent ingress of insects and debris into the enclosure Mounting STEP 5 Anchor the PCS enclosure to the concrete pad Use inch 10 mm diameter 2 inch 51 mm embed Hilti Kwik Bolt TZ anchors for each bracket The anchor brackets s...

Страница 13: ...cttothenegative terminal on the PureWave SMS 250 system Note that battery voltage is floating from the earth reference The battery enclosure must be bonded as indicated in the Earth Reference and Bonding section on page 16 Power Connections Terminate the ac cables to the line inputs L1 L2 and L3 in the cable termination area The ac output of the SMS 250 neutral is not bonded to ground The input an...

Страница 14: ...eferences for electronic signals All cable tray conduit and raceway systems installed to interconnect power control and communications wiring to and from the PureWave SMS 250 unit shall be electrically continuous by bonding together at each individual section Each individual cable tray conduit and raceway section including pull boxes junction boxes and outlet boxes shall be bonded to the facility ...

Страница 15: ...4 IN and any project specific drawings supplied with the PureWave SMS 250 system Note any problems found and corrective actions applied Torques Check all factory and field bolted electrical connections inside the PCS enclosure and verify they are torqued to the proper tightness See Table 4 for torque requirements Base Covers Install the base covers if not already installed at the front and back fo...

Страница 16: ...ke sure all edges are feathered before applying primer Pre Startup Checklist The pre startup checklist will be provided and should be reviewed and filled out by the installing contractor The document must be signed and faxed to S C Electric Company at 414 423 8766 Annual Inspections After the PureWave SMS 250 system is commissioned and the unit is online inspection and maintenance should be schedu...

Отзывы: