    S&C Instruction Sheet 659-555

Installation, Assembly, and Setup

Shimming, Grouting, and Caulking the  

PCS Enclosure

To shim, grout, and caulk the PureWave SMS-250 PCS 
enclosure, follow these procedures:

STEP 1. 

After placing the PCS enclosure at the desired 
location, check whether there are any gaps between 
the enclosure and the concrete pad.

STEP 2. 

If there are gaps, install shims until the enclosure is 
level.

STEP 3. 

Apply grout at the bottom of the enclosure as 
necessary to prevent entry of insects or debris into 
the enclosure. The grout should be recessed 
sufficiently to permit injecting a bead of caulk 
between the enclosure base and concrete pad.

STEP 4. 

Apply a bead of caulk (S&C part number 6943- 010, 
DAP Premium Polyurethane Waterproof Concrete 
& Masonry Sealant 300 ml Gray) around the outer 
edge of the bottom flange (where it meets the 
concrete pad) to provide a seal around the base of 
the PCS. The purpose of the caulk is to further 
prevent ingress of insects and debris into the 
enclosure.

Mounting

STEP 5. 

Anchor the PCS enclosure to the concrete pad. Use 

-inch (10-mm) diameter × 2-inch (51-mm) embed 

Hilti Kwik Bolt TZ anchors for each bracket. The 
anchor brackets should be located at each corner, 
as shown in Figure 5. Tighten the bolts again three 
to five days after the initial installation.

NOTICE

If seismic rating is required, 

-inch diameter 

× 2-inch embed Hilti Kwik Bolt TZ anchors 
must be installed at each mounting bracket 
location . Failure to do so can result in damage 
to equipment .

STEP 6. 

After pulling the cables, seal all conduit entrances 
on the outside with room temperature vulcanization 
silicone sealant and on the inside with duct seal 
foam to prevent water from entering the PCS 
enclosure.

Figure 5. Mounting points.

Содержание PureWave SMS-250

Страница 1: ...placement Instructions and Labels 3 Location of Safety Labels 4 Trip Settings 5 Breaker Protection Curves 6 Safety Precautions 7 Shipping and Handling Packing 8 Inspection 9 Handling 9 Installation Assembly and Setup System Design 11 Concrete Pad Specifications 11 Pad Requirements 11 Shimming Grouting and Caulking the PCS Enclosure 12 Mounting 12 Cable Terminations 13 Battery Connection 13 Power C...

Страница 2: ... inside a compartment in the PCS enclosure where they can be easily retrieved for future use Proper Application WARNING The equipment in this publication must be selected for a specific application The application must be within the ratings furnished for the equipment Failure to do so can result in damage to equipment Warranty The warranty and or obligations described in S C s standard conditions ...

Страница 3: ...injury if instructions including recommended precautions are not followed NOTICE NOTICE identifies important procedures or requirements that can result in product or property damage if instructions are not followed Following Safety Instructions If you do not understand any portion of this instruction sheet and need assistance contact your nearest S C Sales Office or S C Authorized Distributor Thei...

Страница 4: ...ngs The symbol represents the power on button When the button with the symbol is pressed the breaker places the equipment into a fully powered state Equipment grounding conductor The symbol represents the power off button When the button with the symbol is pressed the breaker dis connects the load side from the power source The ac breaker disconnects the ac output to theload A dc breaker to discon...

Страница 5: ...A rms 16 68 ms Short circuit current maximum amps peak and duration ms 2280 A rms 16 68 ms Short circuit current breaking amps RMS and duration ms 0 Arms Short L1 L3 Short circuit current initial amps rms and duration of 16 7 ms or 1 cycle 1110 3 A rms 13 ms Short circuit current maximum amps peak and duration ms 1570 A peak 13 ms Short circuit current breaking amps RMS and duration ms 0 A rms Sho...

Страница 6: ...ruction Sheet 659 555 Safety Information Breaker Protection Curves The power conversion system has a fixed output The ac breaker is configured at the factory with the following protection curve Current in Amperes ...

Страница 7: ...heuseofthepadlockprovide protection against inadvertent contact with hazardous voltages 8 GROUNDING For grounding purposes the pro ceeding must be followed The PCS base ground bar in the cable termination area must be connected to a suitable earth ground for testing before energizing the unit and at all times when energized The overall ground system should be sufficient to limit the ground potenti...

Страница 8: ...sion system enclosure ships in one piece See Figures 1 and 2 NOTICE The Human Machine Interface HMI computer and bat teries for the PureWave SMS 250 system are shipped separately Figure 1 The power conversion system enclosure Figure 2 Internal view of the power conversion system ...

Страница 9: ...rawing PEA 1610 4 IN and any other project specific lifting drawings supplied with the PureWave SMS 250 system Lifting equipment such as spreader bars and hoist sling straps are provided by others To avoid damaging the PCS enclosure when placing it at the desired location observe normal recommended procedures as well as the following general instructions CAUTION The PCS installer must ensure ALL l...

Страница 10: ...or the location of cable entry conduit and mounting bracket installation areas For further details refer to drawing PEA 1610 4 IN and the other project specific lifting drawings supplied with the PureWave SMS 250 system STEP 5 Remove the sling straps Figure 3 Proper lifting of the power conversion system enclosure Figure 4 Conduit and bracket measurements for pad mounting This point should be at l...

Страница 11: ...f degree and should have a flatness within inch 3 175 mm The pad should extend beyond the edge of the enclosure by an adequate amount to prevent the pad from cracking or breaking when the Hilti Kwik Bolt TZ anchor bolts are installed to bolt the PCS enclosure to the pad Pad Requirements General Requirements The concrete pad contractor shall provide and be responsible fordeterminationandexecutionof...

Страница 12: ...nt 300 ml Gray around the outer edge of the bottom flange where it meets the concrete pad to provide a seal around the base of the PCS The purpose of the caulk is to further prevent ingress of insects and debris into the enclosure Mounting STEP 5 Anchor the PCS enclosure to the concrete pad Use inch 10 mm diameter 2 inch 51 mm embed Hilti Kwik Bolt TZ anchors for each bracket The anchor brackets s...

Страница 13: ...cttothenegative terminal on the PureWave SMS 250 system Note that battery voltage is floating from the earth reference The battery enclosure must be bonded as indicated in the Earth Reference and Bonding section on page 16 Power Connections Terminate the ac cables to the line inputs L1 L2 and L3 in the cable termination area The ac output of the SMS 250 neutral is not bonded to ground The input an...

Страница 14: ...eferences for electronic signals All cable tray conduit and raceway systems installed to interconnect power control and communications wiring to and from the PureWave SMS 250 unit shall be electrically continuous by bonding together at each individual section Each individual cable tray conduit and raceway section including pull boxes junction boxes and outlet boxes shall be bonded to the facility ...

Страница 15: ...4 IN and any project specific drawings supplied with the PureWave SMS 250 system Note any problems found and corrective actions applied Torques Check all factory and field bolted electrical connections inside the PCS enclosure and verify they are torqued to the proper tightness See Table 4 for torque requirements Base Covers Install the base covers if not already installed at the front and back fo...

Страница 16: ...ke sure all edges are feathered before applying primer Pre Startup Checklist The pre startup checklist will be provided and should be reviewed and filled out by the installing contractor The document must be signed and faxed to S C Electric Company at 414 423 8766 Annual Inspections After the PureWave SMS 250 system is commissioned and the unit is online inspection and maintenance should be schedu...

Отзывы: