Packing and Inspection

Packing

Study the erection drawing carefully and check the bill of material to be sure that all 
parts are at hand. Standard Minor Modification parts are shown on the bill of material 
under the suffix specified: “-S1,” “-S2,” “-S6,” “-S6L,” “-V1,” “-V2,” or “-V3.”

When a Standard Mounting Arrangement is specified, the shipment will include: 

1.  A 

three-pole interrupter switch

, complete with interphase drive, factory-assembled 

on a single base. (Upright-mounted or triangular-mounted.)

2.  Four 6

 10

 

vertical-operating pipe sections

, predrilled, where required, for attach-

ment to the universal couplings.

3.  Miscellaneous 

mounting hardware

 (less through-bolts) for securing the Omni-Rupter 

switch to the pole.

4.  The appropriate set of 

operating-mechanism components

 for the vertical operating 

pipe; e.g. handle, guide bearings, and couplings—each tagged and keyed to the bill of 
material for ready identification. 

5.  If a 

Standard Minor Modification

 of a Standard Mounting Arrangement is specified, 

the appropriate parts, as identified in the bill of materials under suffix : “-S1,” “-S2,” 
“-S6,” or “-S6L” will be included with the operating-mechanism components. Specifi-
cally, the modifications designated by these suffixes are:

  -S1  One tubular fiberglass insulating section in vertical operating shaft.
  -S2  One Cypoxy® Insulator unit in vertical operating shaft.
  -S6  Key interlock—single lock for “locked open” application.
  -S6L  Provisions only for key interlocks—mounting bracket for interlock.
  “-V1,” “-V2,” or “-V3”—adds (one, two, or three respectively) extra 6

10

 lengths of 

pipe and includes the appropriate number of extra couplings and guides.

6.  A 

detailed erection drawing

 (ED) for the Omni-Rupter will be found in a water-

resistant envelope shipped with the switch. If a Standard Mounting Arrangement is 
to be used, this erection drawing is a printed sheet. This same sheet is also furnished 
when a Standard Minor Modification of a Standard Mounting Arrangement is to be 
used. In the latter case, a copy of RD-3469 (Standard Minor Modifications, Rotating-
Type and Reciprocating-Type Operating Mechanisms) is included.
Drawings for Standard Mounting Arrangements show only minimum or suggested 

locating dimensions for the vertical-operating-pipe guide bearings and the operating-
handle assembly. Specific locations are to be determined either on the job or by the 
user’s engineering department.

Inspection

Examine the shipment for external evidence of damage as soon after receipt as possible, 
preferably before removal from the carrier’s conveyance. Check the bill of lading to make 
sure that shipping skids, crates, and containers listed thereon are present:

If there is visible loss and/or damage:

1.  Notify the delivering carrier immediately.
2.  Ask for a carrier inspection.
3.  Note condition of shipment on all copies of the delivery receipt.
4.  File a claim with the carrier.

If concealed damage is discovered:

1.  Notify the delivering carrier within 15 days of receipt of shipment.
2.  Ask for a carrier inspection.
3.  File a claim with the carrier.

Also notify S&C Electric Company in all instances of loss and/or damage.
Each integer style Omni-Rupter switch is factory-assembled on a common base. All 

switch adjustments, including those of the interphase drive, are made at the factory to 
ensure proper switch operation during opening and closing. Ease of installation is assured 
by following these step-by-step instructions.

Содержание Omni-Rupter

Страница 1: ...structions 4 Replacement Instructions and Labels 4 Location of Safety Labels 5 Safety Precautions 6 Packing and Inspection Packing 7 Inspection 7 Installation Operating Pipe Preparation 8 Mounting to...

Страница 2: ...of the interrupter switch blades to determine that the intended position has been attained Then tag or padlock the operating handle in accordance with standard system operating procedures In all cases...

Страница 3: ...es 4 and 5 Retain this Instruction Sheet This instruction sheet is a permanent part of your S C Omni Rupter Switch Designate a location where you can easily retrieve and refer to this publication Prop...

Страница 4: ...ecommended precautions are not followed NOTICE NOTICE identifies important procedures or requirements that if not followed can result in product or property damage if instructions are not followed Fol...

Страница 5: ...ER Switches may be energized from either side and with blades in any position G 6580 2 C WARNING Lifting Instructions G 5928R3 D WARNING Lifting Instructions G 10030 E NOTICE Do not remove this liftin...

Страница 6: ...thing in accordance with safe operating procedures and rules 4 SAFETY LABELS AND TAGS Do not remove or obscure any of the DANGER WARNING CAU TION or NOTICE labels and tags Remove tags ONLY if instruct...

Страница 7: ...f extra couplings and guides 6 A detailed erection drawing ED for the Omni Rupter will be found in a water resistant envelope shipped with the switch If a Standard Mounting Arrangement is to be used t...

Страница 8: ...e utility pole at the desired height for mounting the switch Refer to the erection drawing for details Step 2 Insert two inch diameter through bolts not furnished in the holes drilled in Step 1 and se...

Страница 9: ...witch is fully closed b Attach lifting slings ONLY to the lifting brack ets bolted to the wooden support members c Lift the switch as shown in Figure 1 until the lifting slings are just taut d Unbolt...

Страница 10: ...the switch is fully closed b Attach lifting slings ONLY to the vertical switch support member by looping around the dead ending bracket and the switch mounting weldment c Lift switch as shown in Figur...

Страница 11: ...e turning until a firm resistance is felt NOTICE Installing Piercing Set Screws This equipment uses piercing set screws to couple the operating mechanism to the operating pipe and to provide stability...

Страница 12: ...joined with rigid couplings rather than universal couplings See Figure 7 Make certain the cutting tips of the piercing set screws in the rigid coupling do not protrude through the body of the coupling...

Страница 13: ...the lowest vertical operating pipe section a few inches above the operating handle assembly or key interlock with the U bolt connector pro vided for this purpose Then connect the lower end of the stra...

Страница 14: ...age Now adjust the closed position stop plate so that the handle will require even greater pressure to force it into the closed position slot Mark on the support plate the location of the closed posit...

Страница 15: ...option The wildlife protection option is not designed to be installed on energized equipment Failure to do so could lead to serious injury or death The wildlife protection option helps prevent climbi...

Страница 16: ...covers onto the steel base of the switch in the positions shown on the associated RD draw ing If optional surge arrester mounting provi sions Catalog Number Suffix A1 or A2 have been specified for th...

Страница 17: ...tches Porcelain and Cypoxy Insulators Blade end of the switch Install the wildlife disk on the bottom skirt root of the insulator Contact end of the switch Count up two skirts from the base and instal...

Страница 18: ...ides together until the tabs audibly snap into place c Push the two halves of the disk together in towards the insulator so that it fits the insula tor as close as possible See Figure 17 Snap the uppe...

Страница 19: ...are applied to only one side of the switch Maximum dead end loading for S C dead ending brackets on switches with insulated bases a 750 pounds or 500 pounds per conductor 14 4 kV and 25 kV respectivel...

Страница 20: ...ration procedure before connecting to Omni Rupter terminal pads CAUTION DO NOT apply excessive load to the termi nal pads The jumper connections should be in line with and level to the terminal pad bo...

Страница 21: ...shift the guide bear ings toward or away from the pole Alignment slots are provided for this purpose See Figures 6 and 7 on page 12 a Slide the interlock bracket locking disc operating handle assembly...

Страница 22: ...er the open position slot when the switch is in the open position Hold the locking disc inch below the interlock bracket see Figure 22 and drill inch holes through the vertical operating pipe section...

Страница 23: ...ulator and move the switch blade until it is in the fully closed position with the blade against the bumper stop then retighten the bolts making sure the blade remains in the fully closed position Cyp...

Страница 24: ...met A Z nv0 minimum clearance between the opening cam and the opening lever A clearance between C cx0 and M cx0 between the shunt contact and the interrupter housing at the beginning of the closing sw...

Страница 25: ...th the shunt contact during the duration of the closing stroke This will ensure that the shunt contact and interrupter housing contact stay in the circuit long enough for the interrupter to break the...

Страница 26: ...minimum clearance between the opening cam and the opening lever A clearance between B cx0 and M cx0 between the shunt contact and the interrupter housing at the beginning of the closing sweep d Place...

Страница 27: ...at the shunt contact and interrupter housing contact stay in the circuit long enough for the interrupter to break the circuit during the opening stroke g If adjustment is required loosen the bolts tha...

Страница 28: ...Printed in U S A...

Отзывы: