![S&C Omni-Rupter Скачать руководство пользователя страница 12](http://html2.mh-extra.com/html/sandc/omni-rupter/omni-rupter_installation-manual_3085583012.webp)
12
S&C Instruction Sheet 765-500
Step 7
Install a universal coupling on the lower end
of the uppermost section of vertical operating
pipe in the fashion described above, using the
¹⁄₂
—13
2
¹⁄₂
bolt and
¹⁄₂
—13 nut provided. See
Figure 6.
Step 8
Position and install the guide bearing assembly
on the pole in accordance with the dimension
shown on the erection drawing.
Step 9
Pass the next section of vertical operating pipe
up through the guide bearing and attach it to
the universal coupling on the lower end of the
uppermost vertical-operating-pipe section. See
Figure 6.
Step 10
Repeat Steps 7 and 8 if additional sections of
vertical operating pipe and guide bearing assem-
blies are specified. These additional sections of
vertical operating pipe will be joined with rigid
couplings rather than universal couplings. See
Figure 7. Make certain the cutting tips of the
piercing set screws in the rigid coupling do not
protrude through the body of the coupling when
inserting sections of vertical operating pipe into
the coupling. After the pipe is in place, torque
the clamp bolts to final tightness; then tighten
the associated piercing set screws, piercing the
pipe, and continue turning until a firm resistance
is felt.
Installation
Figure 6. Guide bearing assembly and universal coupling (upper
position).
Uppermost pipe
section
¹⁄₂
2
13
2
¹⁄₂
bolts (2)
Universal coupling
(rigid couplings used
below this group)
Guide bearing
assembly
Alignment-adjusting slots
Gaining channel (used
on round poles only)
Figure 7. Guide bearing assembly and rigid coupling (intermediate
positions).
Clamp bolts (2)
Rigid coupling
Alignment-adjusting
slots
Gaining channel (used
on round poles only)
Guide bearing
assembly
Piercing
set screws (2)
Содержание Omni-Rupter
Страница 28: ...Printed in U S A...