 S&C Instruction Sheet 1023-510    17

Installing the Capacitor Control

Figure 19. Terminal Block wiring and test point configuration for catalog number suffix -JB1 or -JB2.

Follow these steps to attach the control to a metal or concrete pole:

STEP 1. 

Pass a stainless-steel strap or clamp through the two upper mounting slots in the 
bracket. Pass a second strap through the two lower mounting slots. See Figure 15 
on page 15.

STEP 2. 

Lift the control into position on the pole. Then, support the control while tightening 
the upper and lower straps around the pole.

STEP 3. 

Confirm that the cable from the switch and power source is wired correctly for the 
connector on this control. See Figure 19.

A bracket-mounted control may have additional sensor cable connectors  

installed on the bottom of the enclosure. The wiring options for bracket-mount 
connectors are shown in Figures 16 through 18 on page 16. The configuration 
used in the control is also shown on a label on the inside of the enclosure door.

STEP 4. 

Connect the ground lug on the bottom of the control.

Use the ground lug on the bottom of the control enclosure to ground the enclo-

sure. See Figures 11 and 12 on page 12. The ground lug will accommodate up to 
#2 copper or aluminum, solid or stranded wire.

   WARNING

The control must be properly grounded . You must read and understand all 

 

applicable grounding codes and requirements for your service area before installing 
this device . An ungrounded control may have potentially lethal high voltage present .

STEP 5. 

Connect the cable from the junction box to the connector on the bottom of the 
capacitor control.

When an energized cable is connected to the control, all faceplate LED  

displays light momentarily. The LCD screen will start to scroll after a few  
seconds.

Make sure the OPERATION MODE MANUAL and SCADA CONTROL LOCAL 

LED displays are lit. If not, press the applicable CHANGE button.

   WARNING

The control must be set to 

Manual and Local mode to avoid unexpected operation of 

the capacitor bank during installation or setup operations . When the control uses dial-
up software, it may still be operated remotely and may operate unexpectedly .

STEP 6. 

Go to the “Connecting Sensors” section on page 20.

c

c

c

c

Содержание IntelliCap Plus

Страница 1: ...ty Information Understanding Safety Alert Messages 4 Following Safety Instructions 4 Replacement Instructions and Labels 4 Safety Precautions 5 Pre Installation Instructions Applicable Software 6 Pre...

Страница 2: ...C s standard conditions of sale as set forth in Price Sheets 150 and 181 applies to the S C IntelliCap Plus Automatic Capacitor Control except that the first paragraph of the said warranty is replaced...

Страница 3: ...urchaser or end user all manufacturer s warranties that apply to such major components Warranty of equipment services packages is contingent upon receipt of adequate informa tion on the user s distrib...

Страница 4: ...y if instructions including recommended precautions are not followed NOTICE NOTICE identifies important procedures or requirements that can result in product or property damage if instructions are not...

Страница 5: ...utomatic Capacitor Control must be restricted only to Qualified Persons 2 SAFETY PROCEDURES Always follow safe operating procedures and rules Always maintain proper clearance from energized components...

Страница 6: ...on the control Use a straight through cable not a null modem cable The cable must be long enough to connect to an installed IntelliCap Plus control The serial connection is RS232 with a DB9 pin conne...

Страница 7: ...smoke fire open fuses crackling noises loud buzzing etc If a malfunction is suspected treat all components of the installation including the control and associated mounting hardware as if they were e...

Страница 8: ...al strip wires connect to the meter base or cable connectors A meter base with pole mounting bracket and meter ring assembly is available from S C Follow these steps to mount the control in the meter...

Страница 9: ...er suffix J40 Figure 3 Four jaw meter base socket configuration for capacitor controls with catalog number suffix J41 Figure 4 Six jaw meter base socket configuration for capacitor controls with catal...

Страница 10: ...e socket configuration for capacitor controls with catalog number suffix J62 Figure 7 Six jaw meter base socket configuration for capacitor controls with catalog number suffix J63 Ac line Open Ac neut...

Страница 11: ...t configuration for capacitor controls with catalog number suffix J65 Figure 10 Six jaw meter base socket configuration for capacitor controls with catalog number suffix J68 Ac line Open Ac neutral cu...

Страница 12: ...evice An ungrounded control may have potentially lethal voltage present Figure 11 Ground lug on the bottom of the enclosure Neutral current neutral voltage lockout indicator LED optional Sensor input...

Страница 13: ...operation of the capacitor bank during installation or setup operations Note that if the control uses dial up software it may still be operated remotely and could operate unexpectedly Figure 13 Side...

Страница 14: ...or cable connector s mounted on the bottom of the enclosure See Figure 11 on page 12 STEP 6 Connect the ground lug on the bottom of the control Use the ground lug on the bottom of the control enclosur...

Страница 15: ...losure showing the mounting holes Figure 15 Side view of the capacitor control enclosure showing the mounting slots 14 79 376 1 00 25 9 85 250 20 00 508 18 00 457 5 00 127 IntelliCap Plus 10 25 260 8...

Страница 16: ...ral Figure 17 Bracket mount receptacle wiring configuration seven pin for capacitor controls with catalog number suffix M03 or D13 Line current sensor hot Neutral current voltage sensor hot Return for...

Страница 17: ...ct the ground lug on the bottom of the control Use the ground lug on the bottom of the control enclosure to ground the enclo sure See Figures 11 and 12 on page 12 The ground lug will accommodate up to...

Страница 18: ...is 0 5 watts Control power is used to wett the Open and Close relay contacts to operate the capacitor bank switches or the interposing relays The IntelliCap Plus relay contacts are rated at 20 A at 2...

Страница 19: ...igh line to the Ac Line input of the IntelliCap Plus control Use two auxiliary relays with 120 volt coils and 240 volt contacts rated to meet the requirements of the capacitor switch and connect as in...

Страница 20: ...n 4 wire distribution systems where the starpoint of the capacitor bank is tied to the neutral and or ground you must install the neutral current sensor between the starpoint and the system neutral an...

Страница 21: ...Control A phase B phase C phase Neutral Fuses Switches Starpoint Sensor option To cap control PT option S C sensor option Lindsey sensor option To cap control To cap control To cap control Figure 22 N...

Страница 22: ...ing c Press the LAMP TEST button and check that all the faceplate LED displays illuminate STEP 2 Replace the load fuse STEP 3 Check the Close Open relays by operating the capacitor bank a Make sure th...

Страница 23: ...e and Manual not Automatic mode until the software in the capacitor control is set up for this installation Otherwise unex pected operation may occur If this capacitor control uses a radio check that...

Страница 24: ...provides a communication signal and power 12 Vdc connection for the radio Wiring for the six pin IDC 0 156 inch header in the control is shown in Figure 24 The cable from the radio is terminated with...

Страница 25: ...S C Instruction Sheet 1023 510 25 Installation and Connection Drawings...

Страница 26: ...26 S C Instruction Sheet 1023 510 Installation and Connection Drawings...

Страница 27: ...S C Instruction Sheet 1023 510 27 Installation and Connection Drawings...

Страница 28: ...28 S C Instruction Sheet 1023 510 Installation and Connection Drawings...

Страница 29: ...S C Instruction Sheet 1023 510 29 Installation and Connection Drawings...

Страница 30: ...30 S C Instruction Sheet 1023 510 Installation and Connection Drawings...

Страница 31: ...S C Instruction Sheet 1023 510 31 Installation and Connection Drawings...

Страница 32: ...32 S C Instruction Sheet 1023 510 Installation and Connection Drawings...

Отзывы: