G
Pour DRY sand
into opening.
H
Step 1
Step 1: Fill Roller Assembly With Approximately 16 to 20 lbs.
of DRY Sand.
Completely fill Roller Tube (G), WITH SAND, via hole located on end
of tube. Once completely filled, thread and FULLY TIGHTEN Roller
Plug with provided Roller Plug Fastener.
User Tip!
Failure to FULLY TIGHTEN roller plug will result in the
Roller Plug blocking the roller’s ability to turn. Failure to fill roller
with recommended amount of sand may result in a less dramatic
patterning effect.
B
A
Lawn Mower Handlebar
K
Step 2
Step 2: Attach Inner and Outer
Clamps to Handlebars.
Within the LOWER THIRD of lawn
mower’s handlebar, place Inner
Clamp (A) on inside of handlebar
while attaching Outer Clamp (B)
on outside of handlebar. Connect
Inner Clamp (A) and Outer Clamp
(B) as outlined in above diagram.
Outer Clamp’s teeth (B) should be
facing outward. Check that the
word (
K
UP
K
), located on Outer
Clamp (B) is facing upward.
REPEAT same process on other handlebar. Make certain Outer Clamp’s
teeth (B) are facing outward. Check that the word (
K
UP
K
), located on
Outer Clamp (B) is facing upward.
INSERT AND PARTIALLY TIGHTEN M5x20 Oval Head Screws (K) as
outlined in above diagram.
User Tip!
Line up the extended square inserts on Outer Clamp (B) for
easy attachment to Inner Clamp (A).
1/3 Distance
UP
5
6
7
DO NOT
place clamp system over any type of existing wires/
cables that may be present on lawn mower handlebars.
This diagram shows the RIGHT-HAND
handlebar of the lawn mower.
Roller Plug Fastener
e
UP