2
4.3.4 DEPTH DISPLAY
..................................... 28
4.3.5 SIMULATION
.......................................... 28
Chapter 5: Installation and Maintenance.......................... 29
5.1 INSTALLATION................................................ 30
5.1.1 MAIN UNIT INSTALLATION
........................ 30
5.1.2 POWER CONNECTION
............................. 30
5.2 INSPECTION AND MAINTENANCE/TROUBLE ............30
5.2.1 GENERAL
............................................. 31
5.2.2 TOOLS & TEST APPARATUS
...................... 31
5.2.3 DAILY CHECK AND MAINTENANCE
............. 31
5.2.4 6 months check up(Adjusting period by position)
31
5.2.5 2 years check up(Adjusting period by position)
.. 31
5.2.6 Break Down & First Aid
.............................. 32
5.2.7 Dismantling
............................................ 32
5.3 Checkpoints and Actions to be taken for Irregularities...... 33
APPENDIX 1. PACKING LIST
........................ 36
APPENDIX 2. INSTALLATION DRAWING
.. 38
Содержание SES2000
Страница 3: ...3 This chapter is described about overview of Echo Sounder 1 1 1 1 ECHO SOUNDER...
Страница 8: ...8...
Страница 14: ...14 High Frequency Low Frequency...
Страница 15: ...15 High Frequency Expansion Low Frequency Expansion...
Страница 16: ...16 High Frequency Replay Low Frequency Replay...
Страница 34: ...34...
Страница 35: ...35 APPENDIX 1 PACKING LIST APPENDIX 2 INSTALLATION DRAWING APPENDIX...
Страница 38: ...38 APPENDIX 2 INSTALLATION DRAWING...