Testing Backlights
1.
Remove
CN803
(Main to SMPS) and
CN9003
(Main to Micro Dimming Board) to activate Back Lights.
Both connectors must be removed to light backlights.
2. Check each of the
16
circled BB parts above in each Left
and Right quadrant for approx.
95VDC
by connecting
the plus lead of the multi meter to left side or right side
and negative meter lead to chassis ground.
3. If any read high (approx 160VDC) a string of LED
Backlights are open (defective panel). If a voltage is low,
remove the LED panel connector & test again. If it stays
low replace defective SMPS.
HU9000 Panel Backlights & Micro Dimming Board Test
95VDC
BB9101
Sample
Содержание UN55HU9000FXZA
Страница 1: ......
Страница 3: ......
Страница 7: ......
Страница 8: ...Remote controller Two Remotes Provided HU9000 Remote ...
Страница 9: ......
Страница 10: ...Front View HU9000 HU9000 Front View ...
Страница 11: ...HU9000 ONE CONNECT BOX One Connect Box ...
Страница 12: ......
Страница 14: ......
Страница 16: ......
Страница 18: ......
Страница 19: ...CN803 to Main Board AC Line Fuse Power Connector CN800A to Micro Dimming Board HU9000 SMPS Layout ...
Страница 27: ...Remove 6 Screws Lift off the Bottom Cover One Connect Box Jack Pack One Connect Box ...
Страница 29: ...Jack Pack Board One connect Pin Map 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Inside of HU9000 ...
Страница 35: ...HU9000 Block Diagram ...
Страница 36: ...Main Board Pin Map 1 2 3 4 5 6 7 8 9 14 13 12 11 10 Inside of HU9000 ...
Страница 43: ......
Страница 46: ...SAMSUNG Wi Fi Module Bluetooth Module ...
Страница 49: ...SAMSUNG 2014 3D ...
Страница 56: ......
Страница 63: ......