E-
17
ENGLISH
Using stop valve
Cap
Service
port
Axis
Sealing
point
◆
When you use the service port, always use a charging hose, too.
◆
Check the leakage of refrigerant gas after tightening the cap.
◆
Must use a spanner and wrench when you open/tighten the stop valve.
C
C
C
C
A
A
A
A
U
U
U
U
T
T
T
T
II
II
O
O
O
O
N
N
N
N
To Open the Stop Valve
To Close the Stop Valve
Open the cap and turn the stop valve counterclockwise by using a hexagonal
wrench.
Turn it until the axis is stopped.
1
2
Tighten the cap securely.
3
◆
Do not apply excessive force to the stop valve and always use
special instruments. Otherwise, the stopping box can be
damaged and the back sheet can leaks.
◆
If the watertight sheet leaks, turn the axis back by half, tighten
the stopping box, then check the leakage again. If there is no
leakage any more, tighten the axis entirely.
N
N
N
N
o
o
o
o
tt
tt
e
e
e
e
Remove the cap.
Turn the stop valve clockwise by using a hexagonal wrench.
1
2
Tighten the cap securely.
4
Tighten the axis until the valve reached the sealing point.
3
UH026EAV IM_E_24005 12/29/05 10:56 AM Page 17
Содержание UH026EAV Series
Страница 33: ...ELECTRONICS Printed in Korea ...
Страница 37: ...E 4 Type of outdoor unit A Design Model Heat pump UH035CAV R410A UH052CAV B C UH070CAV ...
Страница 45: ...Connecting the cable Continued E 12 Wiring Diagram of Connection Cord Indoor Unit Outdoor Unit ...
Страница 58: ...ELECTRONICS ...