28
Installation Guide
d.
Rotate the SMP Expansion Module locking levers forward until the SMP
Expansion Module is securely fastened in place. Refer to the following illustra-
tion.
e.
Install the retention bracket.
Note: If there are two SMP Expansion Modules installed in your server, you must
install the retention bracket for each of the SMP Expansion Modules. Be sure
to install the bottom retention bracket first, then repeat steps 2a through 2e for
the top SMP Expansion Module.
Locking
levers
Cover
Handle
Center plane
Содержание SmartServer 3840
Страница 1: ...Installation Guide ...
Страница 2: ... Copyright SAMSUNG Electronics co LTD All rights reserved ...
Страница 10: ...x Installation Guide ...
Страница 16: ...6 Installation Guide ...
Страница 44: ...34 Installation Guide ...
Страница 52: ...42 Installation Guide ...
Страница 67: ......