SAMSUNG Proprietary-Contents may change without notice
Exploded View and Parts List
7-6
This Document can not be used without Samsung's authorization
6
7
1) Attach black tape on FRONT.
2) Assemble SIDE BELT with FRONT.
1) Assemble LCD FPCB with PBA Assy. (Arrange silk line between LCD FPCB and PBA)
2) Set up Hook in bottom side and Assemble PBA Assy with FRONT.
3) Assemble KEY FPCB with PBA Assy.
4) Assemble CAMERA with PBA Assy.
1) Assemble REAR case with FRONT Assy from bottom side to top side.
2) Assemble screws. (6points)
Hook
Silk Line
8
Содержание SGH-L170
Страница 80: ......