SAMSUNG Proprietary-Contents may change without notice
Exploded View/Disassembly&Assembly Instructions
5-15
This Document can not be used without Samsung's authorization
1) Take care so that Con To Con may not attach
Tape.
(Con To Con must be flexible to the left and right.)
1) Be Careful not to get damage of Connector
1) Be careful not to get a damage of case.
2) SCREW TORQUE :
1.0 ~ 1.2 kgf.cm
1) Be Careful not to get damage of Con To Con
21
1)When attaching a black insulation Tape,
insert left side upper part of the tape
first.
1) Assemble a PBA after inserting
upper side Boss hall of PBA first.
22
1) Thighten two Points of screw of the
PBA after inserting PBA and Intenna into
the Front hall.
23
1) Assemble two Connectors.
24
1