ENGLISH
35
AA
Testing operations
1. Check the power supply between the outdoor unit and the auxiliary circuit breaker.
1 phase power supply : L, N
3 phases power supply : R,S,T,N
2. Check the indoor unit.
1) Check that you have connected the power and communication cables correctly. (If the power cable and communication
cables one mixed up or connected incorrectly, the PCB will be damaged.)
2) Check the thermistor sensor, drain pump/hose, and display are connected correctly.
3. Press K1 or K2 on the outdoor unit PCB to run the test mode and stop.
Press K1 button
Start Heating test mode
Press K1 button
Stop
Heating test mode 7-seg display :
Press K2 button
Start Cooling test mode
Press K2 button
Stop
Cooling test mode 7-seg display :
Press K1 button twice
Start Defrost test mode
Press K1 button
Stop
Defrost test mode 7-seg display :
Condition 1 : The outdoor temperature is under 10°C
Condition 2 : All the temperature conditions should meet the defrost conditions
4. After 12 minutes of stationary condition check each indoor unit air treatment :
Cooling mode(indoor unit check)
Inlet air temp. - Outlet air temp. : From 10°C to 12°C
Heating mode(indoor unit check)
Outlet air temp. - Inlet air temp. : From 11°C to 14°C
In heating mode, the indoor fan motor can remain off to avoid cold air blown into conditioned space.
5. How to reset the power supply of the outdoor unit and deactivate the eco mode (standby mode) :
Outdoor unit type A, B, and C :
Press [K3] button to reset the power supply of the outdoor unit and deactivate the eco mode (standby mode)
Only for RC090
, RC100
, RC110
, RC125
, RC140
series model.
ON
1 2 3 4
5 6
7 8
Содержание RC***MHXGA
Страница 11: ...ENGLISH 11 NO Name Note 1 PHE 48P 2 Base Heater SUS316L 150W 3 Water fitting BSPP 1 Male Components RC090 ...
Страница 41: ...41 Memo ...
Страница 42: ...42 Memo ...
Страница 43: ...43 AA Memo ...
Страница 44: ... EEE Yönetmeliğine Uygundur This EEE is compliant with RoHS ...