3-8
3. Disassembly and Reassemble
Description & Screws
Picture Description
Remove the DC VSS-PD BOARD. (Decomposition
order :
1
-
2
)
82"
•
2
•
Gently lift up (Top Left corner) to release
the lock and Slide Board to the Right.
Locking
Fixing Hole
NOTE
1
Before Removing SMPS Board
You have to discharge the SMPS by using
•
service JIG.
If LED ON
9
:
LED
OFF
, discharge is
completed.
Measurement point
•
<Before discharging> <After discharging>
LED ON
LED OFF
Measurement point
Locking
Slide to the right to release the board
Bottom chassis Guide Fixing Hole
1
2
10
Completed the disassembly.
NOTE
Reassembly procedures are in the reverse order of disassembly procedures.
Содержание QN Q65FNF Series
Страница 79: ...First Screen Appearing in Factory Mode Ex Sample Model 4 27 4 Troubleshooting...
Страница 112: ...5 2 5 Wiring Diagram 75 inches...
Страница 121: ...5 11 5 Wiring Diagram 5 2 2 SMPS Board 49 55 65 inches To Main Board 1 CNM801 2 CNL801...
Страница 132: ......