![Samsung NV73J7740RS Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/samsung/nv73j7740rs/nv73j7740rs_user-and-installation-manual_351507014.webp)
14 English
Ins
tallation
Installation
D
C
B
A
Under-sink cabinet (mm)
A
Min. 550
B
Min. 560
C
Min. 600
D
Min 460 x Min. 50
NOTE
The built-in cabinet must have vents (D) to
ventilate heat and circulate the air.
Mounting the oven
A
Make sure to leave a gap
(A)
of at least 5
mm between the oven and each side of the
cabinet.
B
Secure at least 3 mm of gap
(B)
so that the
door opens and closes smoothly.
NV73J7740RS_EU_DG68-00614E-01_EN.indd 14
2015-05-18 3:37:21