
Installation guide
Installation guide
13
13
(3) Brazing the branch pipes
(3) Brazing the branch pipes
Picture
Picture
Work
Work Description
Description
Things
Things to
to do
do
Check
Check point
point
Brazing the
Brazing the
branch pipe.
branch pipe.
- Nitrogen substituted
- Nitrogen substituted
brazing works on the
brazing works on the
branch pipe to prevent
branch pipe to prevent
generation of foreign
generation of foreign
substance/oxide
substance/oxide
- Check for adequate
- Check for adequate
pressure (0.01 to
pressure (0.01 to
0.1kg/cm
0.1kg/cm
2
2
)
)
Check the pressure and entry
Check the pressure and entry
of nitrogen.
of nitrogen.
3) Refrigerant pipe works (air tightness works)
3) Refrigerant pipe works (air tightness works)
(1) Entry of nitrogen
(1) Entry of nitrogen
Picture
Picture
Work
Work Description
Description
Things
Things to
to do
do
Check
Check point
point
Entry of nitrogen.
Entry of nitrogen.
Inject nitrogen to
Inject nitrogen to
the pipe to test
the pipe to test
leakages.
leakages.
Inject nitrogen at the
Inject nitrogen at the
proper pressure.
proper pressure.
1
1
st
st
: 10kg/cm
: 10kg/cm
2
2
2
2
nd
nd
: 41kg/cm
: 41kg/cm
2
2
In the presence of the
In the presence of the
manager, check air tightness.
manager, check air tightness.
Fill out the check forms.
Fill out the check forms.
(2) Finishing the end of the pipe
(2) Finishing the end of the pipe
Picture
Picture
Work Description
Work Description
Things
Things to
to do
do
Check
Check point
point
Wrap the end of
Wrap the end of
the pipe before
the pipe before
connecting the
connecting the
equipment, so
equipment, so
that nitrogen
that nitrogen
won’t escape.
won’t escape.
Sufficient brazing on the
Sufficient brazing on the
end of the pipe.
end of the pipe.
Visual inspection
Visual inspection
(3) Pressure gauge attached
(3) Pressure gauge attached
Picture
Picture
Work
Work Description
Description
Things
Things to
to do
do
Check
Check point
point
Mark the 1
Mark the 1
st
st
and
and
2
2
nd
nd
pressure to
pressure to
see if it leaks.
see if it leaks.
1
1
st
st
: 10kg/cm
: 10kg/cm
2
2
2
2
nd
nd
: 28kg/cm
: 28kg/cm
2
2
look at the
look at the
scale.
scale.
Check for leakages.
Check for leakages.
Содержание MXJ-HA2512 Series
Страница 1: ......
Страница 137: ...136 136 Installation guide Installation guide ...