3 Alignments and Adjustments
3-5
3-7 Execution Items after replacing the main board
After Replacing the Maing Board
1. Auto Calibration
2. EDID installation(Analog and Digital)
3. Factory Reset
5: Input a monitor serial number and push the enter key.
After Analog input, Please do # 2 ~ 5 when digital input.
Содержание LME20AS
Страница 12: ...11 Disassembly and Reassembly 11 3 10 Main PCB and IB Board Description Picture Description ...
Страница 15: ...13 Circuit Descriptions 13 2 Memo ...
Страница 25: ...Memo 14 Reference Infomation 14 10 ...
Страница 31: ...Memo 3 Alignments and Adjustments 3 6 ...
Страница 33: ...4 Troubleshooting 4 2 WAVEFORMS 2 1 3 4 ...
Страница 35: ...4 Troubleshooting 4 4 WAVEFORMS 6 5 7 ...
Страница 37: ...4 Troubleshooting 4 6 WAVEFORMS 9 5 ...
Страница 38: ...4 Troubleshooting 4 7 ...
Страница 39: ...4 Troubleshooting 4 8 ...
Страница 40: ...4 Troubleshooting 4 9 ...
Страница 41: ...Memo 4 Troubleshooting 4 10 ...
Страница 43: ...6 Electrical Parts List 6 2 Memo ...
Страница 44: ...7 Block Diagrams 7 1 7 Block Diagram 7 1 Block Diagram ...
Страница 45: ...7 Block Diagrams 7 2 Memo ...
Страница 47: ...9 Schematic Diagrams 9 2 This Document can not be used without Samsung s authorization ...
Страница 48: ...9 Schematic Diagrams 9 3 This Document can not be used without Samsung s authorization ...
Страница 49: ...9 Schematic Diagrams 9 4 Memo ...
Страница 53: ...9 Schematic Diagrams 9 2 This Document can not be used without Samsung s authorization ...
Страница 54: ...9 Schematic Diagrams 9 3 This Document can not be used without Samsung s authorization ...
Страница 55: ...9 Schematic Diagrams 9 4 Memo ...