
ENGLISH-21
0
2
INST
ALLING
THE
PRODUC
T
Cautions regarding connecting the anchor bolt
f
Use the rubber washer to prevent the anchor bolt from corroding.
Rubber washer
f
Anchor bolt specifications
Size (m)
Drill bit
diameter (a)
Anchor
length (b)
Sleeve length
(c)
Insertion
depth
Fastening
torque
a
b
c
m
Ø
10
14 mm (1/2”)
75 mm (3”)
40 mm (11/2”)
50 mm (2”)
30 N·m
❋
Use anchor bolts and nuts made of plated zinc or STS material. Regular anchor
bolts or nuts may get damaged by corrosion.
Cautions regarding anti-vibration frame installation
f
During installation, make sure there is no gap between the base ground and the supporting structures such as
anti-vibration frame or H beam.
f
Base ground must be constructed firmly to support the bottom part of the anti-vibration mount.
f
After installing the anti-vibration frame, unscrew the fixing part on the top and bottom part of the frame.
f
If the anti-vibration frame or H beam is fixed to the base ground with anchor bolts, make sure that
waterproofed surface is not damaged by anchor bolts and apply additional waterproof solution if necessary.
CAUTION
k}tGzG~Tnlvptluki]_TW[^``hTWZUGGGYX
YWX]TW^TYXGGG㝘䟸GXaWXa[Z