Alignment and Adjustments
2-10
Samsung Electronics
2-4 Voltage Adjustment
☞
Notes
1. When the SMPS-PCB is replaced, the Va, Vs voltages must be checked and adjusted to the proper levels indicated on the
panel sticker.
TE
TEST
ST POIN
INT
Va Adjustment point (R514)
Va Adjustment point (R514)
Vs Adjustment point (R432)
Vs Adjustment point (R432)
Содержание HPP5581X/XAA
Страница 4: ...1 2 Samsung Electronics MEMO...
Страница 17: ...Alignment and Adjustments Samsung Electronics 2 13 2 6 Wire Diagram...
Страница 23: ...MEMO 4 2 Samsung Electronics...