37
Chapter 5. Quick-Deploy Rack kit Installation Instructions
Overview
This chapter details instructions for installing QNAP rack rails into square-hole racks for the 3U ES NAS.
These quick rails automatically latch into the square holes of racks and greatly reduce installation time.
Kit contents
Item
Figure
Two mounting rails (left
and right)
NOTE
: This rail will fit a rack
between 24" and 36" deep.
Two cage nuts
Six Phillips Screw
Caution
Electrostatic discharge (ESD) can damage electronic components. Perform proper grounding practices
before beginning any installation procedure.
Caution
Always plan the rack installation so that the heaviest item is on the bottom of the rack. Install the
heaviest item first, and continue to populate the rack from the bottom to the top.
Warning
Ensure that the rack is level and stable before working on the rack. Ensure that the rack is level
and stable before working on the rack. Be sure the leveling jacks (feet) extend to the floor and that the
full weight of the rack rests firmly on the floor.
Содержание ES1642dc
Страница 33: ...33 3 Take off the top cover of the Storage Controller by uninstalling the screws 3 at the top 2 at each side...
Страница 35: ...35 3 Take off the top cover of the Storage Controller by uninstalling the screws 3 at the top 2 at each side...
Страница 40: ...40 Figure 4 Attach the screws 1 1 1 1 2 2...
Страница 44: ...44 Appendix C Product Compliance Class NAS Models FCC CE ES1640dc Class A Class A ES1642dc Class A Class A...