1-6
Adjustable
Door
Control
panel
Tools needed for installation
Proper installation is the owner’s responsibility.
HOWEVER, SERVICE CALLS PERFORMED AS A RESULT OF POOR SET-UP, ADJUSTMENT, AND CONNECTION ARE THE
RESPONSIBILITY OF THE INSTALLER.
Make sure you have everything necessary for proper installation.
1. GROUNDED ELECTRICAL OUTLET is required. See Electrical Requirements.
2. POWER CORD for electric dryers (except Canada).
3. GAS LINES (if a gas dryer) must meet national and local codes.
4. EXHAUST SYSTEM – must be rigid metal or fl exible stiffwalled metal exhaust ducting.
See Exhaust Requirements.
Adjustable leg
Pliers
Cutting knife
Pipe wrench
(gas only)
Nut drivers
Level
Screwdriver
(standard)
Duct tape
Crescent
spanner
4061#SUHFDXWLRQV#XSRQ#LQVWDOODWLRQ
Содержание DV306LEW/XAA
Страница 22: ...2 3 5061 RYHUYLHZ RI WKH GU HU ...
Страница 24: ...2 5 5071 RSWLRQ VSHFLILFDWLRQV Lwhp Lwhp Qdph FRGH1QR Uhpdun MANUAL BOOK DC68 02312A DIE RACK DRY DC61 01522A ...
Страница 25: ...2 6 Memo ...
Страница 31: ...3 6 6071 GHVLJQDWLRQ RI PDLQ FRPSRQHQWV 607041 Khdwhu ...
Страница 33: ...3 8 ڐ ڐ ډ ۇڼھۄۉڼۃھۀڨ ۉۊۄێۉۀۈۄڟ ΤΡΖΔ ρ ρ ρ ρ ρ ρ ...
Страница 43: ...5 6 8061 UHDVVHPEO Reassembly procedures are in the reverse order of dissasembly procedures ...
Страница 49: ...6 6 Memo ...
Страница 64: ...9 1 1 EORFN GLDJUDP 041 EORFN GLDJUDP ...
Страница 65: ...9 2 Memo ...
Страница 66: ...10 1 431 ZLULQJ GLDJUDP 43041 ZLULQJ GLDJUDP ...
Страница 67: ...10 2 Memo ...
Страница 68: ...11 1 441 SFE GLDJUDP 4404 PDLQ SFE OD RXW ...
Страница 69: ...11 2 4405 VXE SFE OD RXW ...
Страница 70: ...12 1 12 SCHEMATIC DIAGRAMS This Document can not be used without Samsung s authorization 4504 PDLQ SFE ...
Страница 71: ...12 2 This Document can not be used without Samsung s authorization 4505 VXE SFE ...
Страница 72: ...13 1 461 FLUFXLW GHVFULSWLRQV 46041 RYHUDOO V VWHP ...
Страница 79: ...13 8 Memo ...
Страница 80: ...14 1 471 UHIHUHQFH LQIRUPDWLRQ 47041 PRGHO QDPH ...