
Samsung Electronics
3-10
No
Parts
Procedure
Remark
3
Ass’y Control Out
1) Detach several connectors from the
Ass’y Control Out.
2) Detach several connectors from the PCB
of Ass’y Control Out.
3) Pull up the Ass’y Control Out.
4
Heat Exchanger
1) Release the refrigerant at first.
2) Loosen fixing screw on both sides.
3) Disassemble the pipes in both inlet and
outlet with welding torch.
4) Detach the Heat Exchanger.
DB98-29522A_USA_SM.indd 19
2008-2-29 13:18:07
Содержание DH140EAV
Страница 62: ...Samsung Electronics DH140CAV 5 3 DB98 29522A_USA_SM indd 58 2008 3 13 12 50 40...
Страница 66: ...Samsung Electronics 5 7 5 3 Assy control out UH105 140CAV DB98 29522A_USA_SM indd 62 2008 2 29 13 18 45...
Страница 68: ...Samsung Electronics 5 9 MEMO DB98 29522A_USA_SM indd 64 2008 2 29 13 19 02...
Страница 95: ...Samsung Electronics 6 27 MEMO DB98 29522A_USA_SM indd 27 2008 2 29 13 19 13...
Страница 101: ...Samsung Electronics 9 Preference Sheet 9 1 Refrigerating Cycle Diagram 9 1 DB98 29522A_USA_SM indd 2 2008 2 29 13 25 45...