E-
13
C
OMPLETING THE
I
NSTALLATION
Fixing the Indoor Unit in Place
After checking for gas leaks in the system, insulate the pipe, hose and cables.
Then place the indoor unit on the installation plate.
1
To avoid condensation problems, place heat-resistant polyethylene foam
separately around each refrigerant pipe in the lower part of the indoor unit.
2
Wrap the refrigerant pipe and the drain hose in the rear of the indoor unit with
the absorbent pad.
Wind the pipe and hose three times to the end of the indoor unit with the
absorbent pad. (20mm interval)
3
Wind the pipe, assembly cable and drain hose with insulation tape.
4
Place the bundle (the pipe, assembly cable and drain hose) in the lower part of
the indoor unit carefully so it doesn’t project from the rear of the indoor unit.
5
Hook the indoor unit to the installation plate and move the unit to the right
and left until it is securely in place.
6
Wrap the rest of the pipe with vinyl tape.
7
Attach the pipe to the wall using clamps (optional).
Installation plate
Make sure to check for gas leaks before completing the installation process
(connecting the assembly pipe and hose between indoor unit and outdoor
unit, insulating the cables, hose and pipe, and fixing the indoor unit to the
installation plate)
To check for gas leaks on the...
Using a leak detector, check the...
Indoor unit
Flare nuts at the end of sections
C and D.
Outdoor unit
Valves on sections A and B.
Performing the Gas Leak Tests
C
D
A
B
Содержание AS10V Series
Страница 16: ......