12-8
Samsung Electronics
12-6-2 "Pump down" Procedure
Pump down will be carried out when an evaporator is replaced or when the unit is relocated in another area.
Relocation of the air conditioner
t3FGFSUPUIJTQSPDFEVSFXIFOUIFVOJUJTSFMPDBUFE
t$BSSZPVUUIFQVNQEPXOQSPDFEVSF SFGFSUPUIFEFUBJMTPGAQVNQEPXOh
t3FNPWFUIFQPXFSDPSE
t%JTDPOOFDUUIFBTTFNCMZDBCMFGSPNUIFJOEPPSBOEPVUEPPSVOJUT
t3FNPWFUIFGMBSFOVUDPOOFDUJOHUIFJOEPPSVOJUBOEUIFQJQF
t"UUIJTUJNFDPWFSUIFQJQFPGUIFJOEPPSVOJUBOEUIFPUIFSQJQFVTJOHBDBQPSWJOZMQMVHUPBWPJEGPSFJHONBUFSJBM
entering.
t%JTDPOOFDUUIFQJQFDPOOFDUFEUPUIFPVUEPPSVOJU
At this time, cover the valve of the outdoor unit and the other pipe using a cap or vinyl plug to avoid foreign
material entering.
t.BLFTVSFZPVEPOPUCFOEUIFDPOOFDUJPOQJQFTJOUIFNJEEMFBOETUPSFUPHFUIFSXJUIUIFDBCMFT
t.PWFUIFJOEPPSBOEPVUEPPSVOJUTUPBOFXMPDBUJPO
t3FNPWFUIFNPVOUJOHQMBUFGPSUIFJOEPPSVOJUBOENPWFJUUPBOFXMPDBUJPO
4) Turn the 3 way valve clockwise to close.
1) Remove the caps from the 3 way valve and the
3 way valve.
2) Turn the 3 way valve clockwise to close and
connect a pressure gauge (low pressure side)
to the service valve, and open the 3 way valve
again.
3) Set the unit to cool operation mode.
(Check if the compressor is operating.)
5) When the pressure gauge indicates "0" turn the
3 way valve clockwise to close.
6) Stop operation of the air conditioner.
7) Close the cap of each valve.
3 way Valve
2 way Valve
Содержание AR09HSSDBWKNEU
Страница 9: ...2 4 ...
Страница 12: ...Samsung Electronics 3 3 Outdoor LED Display Error and Check Method ...
Страница 29: ...4 2 1 4 2 Outdoor Unit 3 Detach the Cabinet Upper like the picture ...
Страница 31: ...8 3 9 ...
Страница 32: ...4 2 4 ...
Страница 51: ...Samsung Electronics 7 1 7 Wiring Diagram 7 1 Indoor Unit ...
Страница 52: ...7 2 Samsung Electronics 7 2 Outdoor Unit ...
Страница 97: ...11 2 Samsung Electronics 11 2 Outdoor unit ...