2
English
Contents
Installation 3
Safety Information on Installation 3
Preparation 8
Step 1.1 Choosing the installation location
Step 1.2 Checking and preparing accessories and tools
Step 1.3 Drilling a hole through the wall
Step 1.4 Taping the pipes, cables, and drain hose
Indoor Unit Installation 12
Step 2.1 Disassembling the cover panel
Step 2.2 Disassembling the installation plate
Step 2.3 Connecting the power and communication cables (assembly cable)
Step 2.4 Optional: Extending the power cable
Step 2.5 Installing and connecting the drain hose
Step 2.6 Optional: Extending the drain hose
Step 2.7 Optional: Changing the direction of the drain hose
Step 2.8 Installing and connecting the assembly pipes to the refrigerant pipes (assembly pipe)
Step 2.9 Shortening or extending the refrigerant pipes (assembly pipe)
Step 2.10 Fixing the installation plate
Step 2.11 Fixing the indoor unit to the installation plate
Step 2.12 Assembling the cover panel
Outdoor Unit Installation 21
Step 3.1 Fixing the outdoor unit in place
Step 3.2 Connecting the power and communication cables and the refrigerant pipes
Step 3.3 Evacuating the air
Step 3.4 Adding refrigerant
Step 3.5 Important information: regulation regarding the refrigerant used
Installation Inspection 25
Step 4.1 Performing the gas leak tests
Step 4.2 Running the Smart Install mode
Step 4.3 Performing final check and trial operation
Maintenane Procedures 28
Sub PCB installation(optional) 29
For information on Samsung’s environmental commitments and product-specific regulatory obligations, e.g.
REACH, WEEE, Batteries, visit : samsung.com/uk/aboutsamsung/samsungelectronics/corporatecitizenship/
data_corner.html
Содержание AR**MXPD Series
Страница 30: ...DB68 06730A 03 ...