
E-
33
Liquid
pipe side
Gas pipe side
Outdoor unit
Tighten the cap of each valve using a
specified tool.
Close the gas pipe side valve, and loosen
the pressure gauge connected.
Then open the gas pipe side valve again.
Stop operation.
Open the tank and refill the refrigerant
until arriving at the proper pressure.
(Refill the refrigent slowly checking the pressure.)
Check the pressure of the pressure gauge.
Check whether the low pressure side is within
the range of 4.5~5.5kg/cm
2
G
(outside temperature 35˚C/95˚F).
Start cooling operation.
Connect it to the refrigerant filling tank.
(Turn the tank upside down : Fill the refrigerant
in liquid form.)
Close the gas pipe side valve by turning it
clockwise.
Connect the pressure gauge to the low
pressure side service valve, and then open
the gas pipe side valve again.
Air purge(at the time of new installation only)
REFRIGERANT CHARGING
REFRIGERANT CHARGING
AIR PURGE/REFRIGERANT CHARGING
Содержание AP-3607BR
Страница 23: ...E 23 MEMO ...
Страница 24: ...THIS AIR CONDITIONER IS MANUFACTURED BY Printed in Korea ...