34
English
Ins
tallation par
t
Installation Procedure
Wrapping the pipes with the insulation
After checking for gas leaks in the system, insulate the
pipe, hose and cables. Then place the indoor unit on the
installation plate.
1
To avoid condensation problems, place heat-resistant
poly-ethylene foam separately around each refrigerant
pipe in the lower part of the indoor unit.
2
Wrap the refrigerant pipe and the drain hose in the
rear of the indoor unit with the absorbent pad.
NOTE
•
Wind the pipe and hose three times to the end of the
indoor unit with the absorbent pad. (20mm interval)
3
Wind the pipe, assembly cable and drain hose with
insulation tape.
4
Place the bundle (the pipe, assembly cable and drain
hose) in the lower part of the indoor unit carefully so it
doesn’t project from the rear of the indoor unit.
Installation plate
5
Hook the indoor unit to the installation plate and move
the unit to the right and left until it is securely in place.
6
Wrap the rest of the pipe with vinyl tape.
7
Attach the pipe to the wall using clamps (optional).
Installing the drain hose
When installing the drain hose for the indoor unit, check if
condensation draining is adequate. When passing the drain
hose through the 65-mm hole drilled in the wall, check the
following:
The hose must
NOT slant
upwards.
5 cm
less
Ditch
The end of the
drain hose must
NOT be placed
under water.
Do NOT bend the
hose in different
directions.
Keep a clearance
of at least 5cm
between the end
of the hose and
the ground.
Do NOT place the
end of the drain
hose in a hollow.
1
If necessary, connect the 2-meter extension drain hose
to the drain hose.
2
If you use the extension drain hose, insulate the inside
of the extension drain hose with a shield.
3
Fit the drain hose into 1 of 2 drain hose holes, then fix
the end of the drain hose tightly with a clamp.
Shield
Drain hose
Extension drain hose
NOTE
•
If you don’t use the other drain hose hole, block it with
a rubber stopper.
DVM_BORACAY_IB_DB68-06415A-00_EN.indb 34