
10
AA
Purging the unit
From factory the unit is supplied and set with a pre-charge of nitrogen gas. (insert gas) Therefore, all insert gas must be purged
before connecting the assembly piping.
Unscrew the pinch pipe at the end of each refrigerant pipe.
RESULT : All inert gas escapes from the indoor unit.
t 5PQSFWFOUEJSUPSGPSFJHOPCKFDUTGSPNHFUUJOHJOUPUIFQJQFTEVSJOH
JOTUBMMBUJPOEP/05SFNPWFUIFQJODIQJQFDPNQMFUFMZVOUJMZPVBSF
ready to connect the piping.
Gas refrigerant port
Liquid refrigerant
port
t $POOFDUUIFJOEPPSBOEPVUEPPSVOJUTVTJOHQJQFTXJUIøBSFE
connections(not supplied). For the lines, use insulated, unwelded,
degreased and deoxidized copper pipe (Cu DHP type to ISO 1337 or
UNI EN 12735-1), suitable for operating pressures of at least 4200kPa
and for a burst pressure of at least 20700kPa. Copper pipe for hydro-
sanitary applications is completely unsuitable.
t 'PSTJ[JOHBOEMJNJUT IFJHIUEJòFSFODFMJOFMFOHUINBYCFOET
refrigerant charge, etc.) see the outdoor unit installation manual.
t"MMSFGSJHFSBOUDPOOFDUJPONVTUCFBDDFTTJCMFJOPSEFSUPQFSNJUFJUIFS
VOJUNBJOUFOBODFPSSFNPWJOHJUDPNQMFUFMZ