
3
.
Installing the Product
English 8/2020. Rev 0.3
45
NOTICE
After connecting the busbar to the terminals (battery module, SMU, fuse), measure the contact
resistance between the terminals and the busbars using a low resistance meter. Refer to Figure
3-38: Contact Resistance Probe Points (Battery Module Terminal to Busbar) for location of the
measurement. Use similar probe locations for SMU terminal to busbar contact resistance, and
fuse to busbar contact resistance. Make sure each probe is in contact with only the intended
location.
The contact resistance must be measured below 40
μΩ
. It is recommended to keep the contact
resistance in all terminals below 30
μΩ
.
Figure 3-38: Contact Resistance Probe Points (Battery Module Terminal to Busbar)
Содержание 93PM
Страница 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 136S ...
Страница 4: ...English 8 2020 Rev 0 3 ...
Страница 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Страница 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Страница 18: ......
Страница 78: ...3 Installing the Product 60 English 8 2020 Rev 0 3 Figure 3 63 Remove Battery Modules 9 s Front Cover ...
Страница 117: ...3 Installing the Product English 8 2020 Rev 0 3 99 Figure 3 130 AC Input Terminals of SMPS Assembly 1 Phase Type B ...
Страница 126: ...Memo ...
Страница 127: ...Memo ...
Страница 128: ...Memo ...
Страница 129: ...www SamsungSDI com ...