
EB 2519 EN
15
Measures for preparation
4 Measures for preparation
After receiving the shipment, proceed as fol-
lows:
1. Check the scope of delivery. Compare
the shipment received with the delivery
note.
2. Check the shipment for transportation
damage. Report any damage to
SAMSON and the forwarding agent
(refer to delivery note).
4.1 Unpacking
Do not remove the packaging until immedi-
ately before installing the valve into the pipe-
line.
Proceed as follows to lift and install the de-
vice:
1. Remove the packaging from the device.
2. Dispose of the packaging in accordance
with the valid regulations.
4.2 Transporting and lifting
Danger due to suspended loads falling.
Stay clear of suspended or moving loads.
Risk of personal injury due to the device
tipping.
−
Observe the device's center of gravity.
−
Secure the device against tipping over or
turning.
Risk of lifting equipment tipping over and
risk of damage to lifting accessories due to
exceeding the rated lifting capacity.
−
Only use approved lifting equipment and
accessories whose minimum lifting capaci
-
ty is higher than the weight of the device.
− Refer to section 3.2 or Data Sheet
u
Risk of valve damage due to incorrectly
attached slings.
−
When lifting the device, make sure that the
slings attached to the valve body bear the
entire load.
−
Observe lifting instructions (see sec
-
DANGER
!
WARNING
!
WARNING
!
NOTICE
!
Содержание EB 2519 EN
Страница 27: ...EB 2519 EN 27 Certificates 10 Certificates The EU declarations of conformity are in cluded on the next pages...
Страница 28: ...28 EB 2519 EN Certificates...
Страница 29: ...EB 2519 EN 29 Certificates...
Страница 30: ...30 EB 2519 EN...
Страница 31: ...EB 2519 EN 31...