16
EB 2519 EN
Measures for preparation
4.2.1 Transporting
The device can be transported using lifting
equipment (e.g. crane or forklift).
Î
Leave the device in its transport container
or on the pallet to transport it.
Î
Observe the transport instructions.
Transport instructions
− Protect the device against external influ
-
ences (e.g. impact).
−
Do not damage the corrosion protection
(paint, surface coatings). Repair any
damage immediately.
−
Protect the device against moisture and
dirt.
−
Observe the permissible ambient tem-
peratures (see section 3.2).
4.2.2 Lifting
To install a large valve into the pipeline, use
lifting equipment (e.g. crane or forklift) to lift
it.
Lifting instructions
−
Secure slings against slipping.
−
Make sure the slings can be removed
from the valve once it has been installed
into the pipeline.
−
Prevent the device from tilting or tipping.
−
Do not leave loads suspended when in-
terrupting work for longer periods of
time.
− Make sure that the axis of the pipeline is
always horizontal during lifting and the
axis of the plug stem is always vertical.
Содержание EB 2519 EN
Страница 27: ...EB 2519 EN 27 Certificates 10 Certificates The EU declarations of conformity are in cluded on the next pages...
Страница 28: ...28 EB 2519 EN Certificates...
Страница 29: ...EB 2519 EN 29 Certificates...
Страница 30: ...30 EB 2519 EN...
Страница 31: ...EB 2519 EN 31...