2-1
EB 20b_EN
February 2022 edition
Subject to technical changes
Markings on the device
2
Markings on the device
Each ball valve usually has the following marking.
Table
|
2-1:
Marking on the type plate and on the body of the valve
Pos.
For
Marking
Remark
1
Manufacturer
PFEIFFER
Address see Chapter “15.4 Service”
2
Valve type
BR (and number value)
e.g. BR 20b = Series 20b, see the PFEIFFER catalogue
3
Body material
e.g. EN-JS 1049
No. of the material standard according to DIN EN 1563 (previous: GGG 40.3)
Lining
e.g. PFA
Material marking of the lining “PFA”
4
Size
DN (and number value)
Number value in [mm], e.g. DN 50/ number value in [inches], e.g. NPS2
5
Maximum pressure
PN (and number value)
Number value in [bar] at room temperature
6
Max. permissible op-
erating temperature
TS (and number value)
PS are TS are related values here at the max. permissible operating temperature with the
max. permissible operating overpressure, see also the Pressure-Temperature Diagram
PT 20b-01 and
PT 20b-02
Max. permissible op-
erating pressure
PS (and number value)
7
Test pressure
PT (and number value)
The test pressure must be observed depending on the device
8
Manufacturer number
from 2018
e.g. 381234/001/001
38
1234
/001
/001
Valve no. within the item
Item in the order
Order
Year of manufacture (38=2018, 39=2019, 30=2020,
31=2021 etc.)
Manufacturer number
2009 to 2017
e.g. 211234/001/001
21
1234
/001
/001
Valve no. within the item
Item in the order
Order
Year of manufacture (29=2009, 20=2010, 21=2011,
22=2012 etc.)
Manufacturer number
until 2008
e.g. 2071234/001/001
207
1234
/001
/001
Valve no. within the item
Item in the order
Order
Year of manufacture (205=2005, 206=2006, 207=2007
etc.)
9
Flow coef
fi
cient
e.g. kvs 10
(DIN) = value, Cv (ANSI) = value (optional)
10
Characteristic curve
e.g. %
% = equal percentage, lin = linear (optional)
11
Test point number
e.g. F123201-1
Speci
fi
ed by the customer
12
DataMatrix code
13
Conformity
CE
Conformity is certi
fi
ed separately by PFEIFFER
Code No.
0035
“Noti
fi
ed body” according to EU Directive = TÜV Rheinland Service GmbH
14
Flow direction
Î
Attention: see the note in Chapter “5.4 Installing the ball valve in the pipe”
Markings on the body and the type plate must be permanent so that the valve remains identi
fi
able.
Info
Содержание EB 20b
Страница 20: ...3 10 EB 20b_EN February 2022 edition Subject to technical changes Design and principle of operation...
Страница 24: ...4 4 EB 20b_EN February 2022 edition Subject to technical changes Shipment and on site transport...
Страница 30: ...6 2 EB 20b_EN February 2022 edition Subject to technical changes Start up...
Страница 32: ...7 2 EB 20b_EN February 2022 edition Subject to technical changes Operation...
Страница 38: ...10 2 EB 20b_EN February 2022 edition Subject to technical changes Decommissioning...
Страница 40: ...11 2 EB 20b_EN February 2022 edition Subject to technical changes Removal...
Страница 42: ...12 2 EB 20b_EN February 2022 edition Subject to technical changes Repairs Figure 12 1 BR 20b ball valve...
Страница 44: ...12 4 EB 20b_EN February 2022 edition Subject to technical changes Repairs...
Страница 46: ...13 2 EB 20b_EN February 2022 edition Subject to technical changes Disposal...
Страница 48: ...14 2 EB 20b_EN February 2022 edition Subject to technical changes Certificates...
Страница 49: ...14 3 EB 20b_EN February 2022 edition Subject to technical changes Certificates...
Страница 50: ...14 4 EB 20b_EN February 2022 edition Subject to technical changes Certificates...
Страница 51: ...14 5 EB 20b_EN February 2022 edition Subject to technical changes Certificates...
Страница 52: ...14 6 EB 20b_EN February 2022 edition Subject to technical changes Certificates...
Страница 60: ...15 8 EB 20b_EN February 2022 edition Subject to technical changes Annex...
Страница 61: ...EB 20b_EN February 2022 edition Subject to technical changes...
Страница 62: ...EB 20b_EN February 2022 edition Subject to technical changes...
Страница 63: ...EB 20b_EN February 2022 edition Subject to technical changes...