![Samson 45-6 Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/samson/45-6/45-6_mounting-and-operating-instructions_3967653037.webp)
EB 3226 EN
8-3
Malfunctions
The malfunctions listed in section 8.1 are
caused by mechanical faults and incorrect
regulator sizing. In the simplest case, the
functioning can be restored following the
recommended action. Special tools may be
required to remedy the fault.
Exceptional operating and installation condi-
tions may lead to changed situations that
may affect the control response and lead to
malfunctions. For troubleshooting, the condi-
tions, such as installation, process medium,
temperature and pressure conditions, must
be taken into account.
SAMSON's After-sales Service can support
you in drawing up an inspection and test
plan for your plant.
Tip
8.2 Emergency action
Operators are responsible for emergency ac-
tion to be taken in the plant.
We recommend removing the regulator from
the pipeline before repairing it.
In the event of a regulator malfunction:
1. Close the shut-off valves upstream and
downstream of the regulator to stop the
process medium from flowing through
the regulator.
2. Perform troubleshooting (see sec-
3. Rectify those malfunctions that can be
remedied based on the instructions
provided here. Contact SAMSON's
After-sales Service in all other cases.
Putting the valve back into operation after
a malfunction
See the 'Start-up' section.
Содержание 45-6
Страница 14: ...2 2 EB 3226 EN Markings on the device...
Страница 38: ...8 4 EB 3226 EN...
Страница 50: ...9 12 EB 3226 EN Servicing...
Страница 54: ...11 2 EB 3226 EN...
Страница 56: ...12 2 EB 3226 EN...
Страница 58: ...13 2 EB 3226 EN...
Страница 62: ...14 4 EB 3226 EN...
Страница 68: ...15 6 EB 3226 EN Annex...
Страница 69: ......
Страница 70: ......
Страница 71: ......