Measures for preparation
Lifting the control valve in the horizontal
position
The control valve can be lifted in the hori-
zontal position either using one hook (Fig. 4)
or using several hooks on a beam (Fig. 5).
1. Attach one sling to the valve body, bon-
net and actuator yoke as well as to the
rigging equipment (e.g. hook) of the
crane or forklift (see Fig. 4 and Fig. 5).
2. Carefully lift the control valve. Check
whether the lifting equipment and acces-
sories can bear the weight.
3.
Move the control valve at an even pace
to the site of installation.
4. Install the control valve into the pipeline.
5. After installation in the pipeline, check
whether the weld seams hold.
6. Remove slings.
Fig. 5:
Lifting using a beam