Start-up
Before start-up or putting the valve back into
service, make sure the following conditions
are met:
−
The valve is properly installed into the
pipeline (see the 'Installation' section).
−
The leak and function tests have been
completed successfully (see the 'Testing
the installed valve' section).
−
The prevailing conditions in the plant
section concerned meet the valve sizing
requirements (see information under 'In-
tended use' in the 'Safety instructions
and measures' section).
Start-up/putting the valve back into opera
-
tion
1. Allow the valve to cool down or warm up
to reach ambient temperature before
start-up when the ambient temperature
and process medium temperature differ
greatly or the medium properties require
such a measure.
2.
Slowly open the shut-off valves in the
pipeline. Slowly opening these valves
prevents a sudden surge in pressure and
high flow velocities which can damage
the valve.
3. Check the valve to ensure it functions
properly.
Содержание 3256
Страница 22: ...3 8 EB 8065 EN...
Страница 44: ...5 18 EB 8065 EN...
Страница 70: ...12 2 EB 8065 EN...
Страница 72: ...13 2 EB 8065 EN...
Страница 74: ...14 2 EB 8065 EN...
Страница 75: ...EB 8065 EN 14 3...
Страница 76: ...14 4 EB 8065 EN...
Страница 80: ...15 4 EB 8065 EN...
Страница 81: ......
Страница 82: ......
Страница 83: ......