
Index revision : A
16
7161
6. Installation
The Inocart NDT or HF carts are delivered assembled.
•
Step 1
: Attach the tank support to the base
of the cart using the screws provided.
•
Step 2:
Connect the air supply and
ground wire to the tank:
- Hose 4/6: dilution air for fluidization (
1
)
- Hose 6/8: injection air (
2
).
- Green/yellow wire: ground (
3
).
•
Step 3
: Connect the 5 m earthing cable to
an electrically earthed part of the applica-
tion booth.
•
Step 4
: Connect the Inobox's power supply
plug.
•
Step 5
: Connect the powder supply hose
of the gun to the NDT or HF pressure tank (
4
) and connect the electrode blowing hose on
the Inobox module side and on the gun side.
The Inocart cart is ready to start the powder application.
Step
1
Step
4
Step
3
3
1
2
4
Step
2