32
6
Installation
6.1
General Installation Diagram
A- Explosive area 1 (A1) or area 2 (A2): paint booth
B - Non-Explosive Zone
The distance of 1 meter mentioned in this diagram is given only as an indication and could not engage the responsibility of SAMES KREMLIN.
The exact delimitation of the areas is the express responsibility of the user, and this according to the products used, the environment of the equipment and the conditions of use.
This distance of 1 meter can thus be adapted if the analysis carried out by the user requires it.
Using an antistatic quality hose, connect the gun to an air pressure regulator capable of supplying a minimum of 2 bar, a maximum of 6 bar.
1 - Pressurized air supply
2 - air regulator
3 - Antistatic air hose 4 - Pressure gauge
5 - Pneumatic gun
1m
Outside of the cabin
Safe Area
Interior of the
cabin
Area 1
A
B
Содержание FPro G
Страница 20: ...20 3 2 Dimensions FPROG FPRO GSP Figure 1 FPro G Figure 2 FPro G Figure 3 FPro GSP Figure 4 FPro GSP...
Страница 27: ...27 4 4 2 Visuals of the marking elements FPro G CONV FPro G LP FPro G GSP...
Страница 55: ...55 Step 13 Raising the trigger Step 14 Feed in air and product...
Страница 56: ...56 10 4 3 Replace air valve Step 1 Loosen the nut...
Страница 57: ...57 Step 2 Unscrew the needle stop then remove the needle spring and needle from the back of the gun...
Страница 60: ...60 Step 9 Back up The greased needle The needle spring The needle stop Tighten the nut...
Страница 65: ...65 Step 1 To remove the hose apply pressure from top to bottom on the arrowed element...
Страница 66: ...66 Step 2 Loosen the regulator Step 3 Unscrew the air needle using the key supplied with the gun...
Страница 74: ...74 Step 3 Install the new anti drip membrane Step 4 Screw on the gravity cup by hand...