Maintenance
23
Pe
rio
dic
ity
Sub-
assembly
Operation to be performed
C
ha
rg
e p
rév
ue
(hh
:mm:
ss)
M
ach
in
e s
tat
e
Tools
Quantity and
description /
ref. provider
Specialty
w
eek
ly (
Sx
1)
Valve
Check the condition of the
hoses
Detect leaks at fittings
00.01.00
Off Off
mechanic
Drain the valve after a
prolonged shutdown.
Off Off
mechanic
• Check the cleanliness of the
tip and its tightness
• Clean or change the tip (dirt
or cord defect)
Off Off
mechanic
bi
m
ont
hl
y
(S
x2
)
• Checking the valve tightness
• Product leakage control
On Run In
Production
Controls
auditory and
visual
mechanic
m
ont
hl
y (
Sx
4)
Check the general condition of
the equipment for cleanliness,
absence of leaks and proper
fixing
00:00:30
On Run In
Production
Visual control
installation
driver
• Cleaning with a cloth
On Run In
Production
installation
driver
bi
m
ont
hl
y
(S
x8
)
Check for material leakage
00.01.00
Off Off
mechanic
annua
lly
(S
x52
)
Disassemble, clean, grease and
replace the seals
Off Off
MAGNALUBE
grease PTFE
mechanic